SET-UP REDUCTION IN PCB AUTOMATED ASSEMBLY

被引:12
作者
BARNEA, A [1 ]
SIPPER, D [1 ]
机构
[1] TEL AVIV UNIV,FAC ENGN,DEPT IND ENGN,IL-69978 TEL AVIV,ISRAEL
来源
COMPUTER INTEGRATED MANUFACTURING SYSTEMS | 1993年 / 6卷 / 01期
关键词
SET UP TIME; PCBS; ASSEMBLY; SCHEDULING;
D O I
10.1016/0951-5240(93)90024-K
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
An heuristic approach to reduce set-up time in printed circuit board assembly is given. A single insertion/placement machine is considered, and set-up time is taken as directly proportional to the number of component replacements. The problem is formulated as an IP model, for which a heuristic method is developed. The method includes two algorithms: sequence and mix. The algorithms are implemented in LISP, and an extensive series of experiments is performed and their results are presented.
引用
收藏
页码:18 / 26
页数:9
相关论文
共 9 条
[1]   A HEURISTIC FOR MINIMIZING THE NUMBER OF TOOL SWITCHES ON A FLEXIBLE MACHINE [J].
BARD, JF .
IIE TRANSACTIONS, 1988, 20 (04) :382-391
[2]  
BARNEA A, 1989, THESIS TEL AVIV U
[3]   A WARNING ABOUT CYCLIC LOT SCHEDULING WITH SEQUENCE DEPENDENT SET-UP TIMES [J].
CARTER, MW ;
MAGAZINE, MJ ;
MOON, TS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (07) :1281-1283
[4]   A LISP-BASED HEURISTIC SCHEDULER FOR AUTOMATIC INSERTION IN ELECTRONICS ASSEMBLY [J].
CUNNINGHAM, P ;
BROWNE, J .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (06) :1395-1408
[5]  
FREED T, 1988, GROUP SET UP PRINTED
[6]  
LOFGREN CB, 1986, IEEE, P1294
[7]  
LOFGREN CB, 1986, IEEE, P139
[8]  
TANG CS, 1988, OPER RES, P767
[9]  
TANG CS, 1986, IEEE, P152