SCHEDULING BATCHES ON PARALLEL MACHINES WITH MAJOR AND MINOR SET-UPS

被引:46
作者
TANG, CS
机构
[1] Anderson Graduate School of Management, University of California, Los Angeles, Los Angeles
关键词
heuristic; manufacturing; Scheduling;
D O I
10.1016/0377-2217(90)90295-M
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a job scheduling model of M identical machines in parallel. The model assumes that a significant set-up time is incurred when a machine changes from processing one type of parts to a different type of parts. A problem is examined that determines the quantity and the schedule of each part type to be processed on each machine. The objective of this problem is to minimize the total completion time. A heuristic approach and two lower bounds on the optimal completion time are presented. In addition, the efficiency of this heuristic is tested on several groups of random problems. © 1990.
引用
收藏
页码:28 / 37
页数:10
相关论文
共 14 条
[1]  
BRADLEY SP, 1977, APPLIED MATH PROGRAM
[2]  
COFFMAN EG, 1978, SIAM J COMPUT, V7, P1, DOI 10.1137/0207001
[3]   TIGHTER BOUNDS FOR THE MULTIFIT PROCESSOR SCHEDULING ALGORITHM [J].
FRIESEN, DK .
SIAM JOURNAL ON COMPUTING, 1984, 13 (01) :170-181
[4]  
GAREY MR, 1978, J ACM, P499
[5]   SCHEDULING PARALLEL PRODUCTION LINES WITH CHANGEOVER COSTS - PRACTICAL APPLICATION OF A QUADRATIC ASSIGNMENT-LP APPROACH [J].
GEOFFRION, AM ;
GRAVES, GW .
OPERATIONS RESEARCH, 1976, 24 (04) :595-610
[6]  
JOHNSON DS, 1973, MAC TR109 MIT REP
[7]  
PARKER RG, 1977, AIIE T, P155
[8]  
Rinnooy Kan AHG, 1976, MACHINE SCHEDULING P
[9]  
STECKE K, 1984, 1ST P ORSA TIMS C FM
[10]  
STECKE K, 1983, MANAGE SCI, P273