AN HISTORICAL-PERSPECTIVE ON THE KISSIMMEE RIVER RESTORATION PROJECT

被引:70
作者
KOEBEL, JW
机构
[1] Kissimmee River Basin Division, Ecosystem Restoration Department, South Florida Water Management District, West Palm Beach, Florida, 33406
关键词
D O I
10.1111/j.1526-100X.1995.tb00167.x
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
This paper reviews the events leading to the channelization of the Kissimmee River, the physical, hydrologic, and biological effects of channelization, and the restoration movement. Between 1962 and 1971, in order to provide flood control for central and southern Florida, the 166 km-long meandering Kissimmee River was transformed into a 90 km-long, 10 meter-deep, 100 meter-wide canal. Channelization and transformation of the Kissimmee River system into a series of impoundments resulted in the loss of 12,000-14,000 ha of wetland habitat, eliminated historic water level fluctuations, and greatly modified now characteristics. As a result, the biological communities of the river and floodplain system (vegetation, invertebrate, fish, wading bird, and waterfowl) were severely damaged. Following completion of the canal, the U.S. Geological Survey released a report documenting the environmental concerns associated with channelization of the river. This action led to the 1971 Governor's Conference on Water Management in South Florida that produced a consensus to request that steps be taken to restore the fish and wildlife resources and habitat of the Kissimmee basin. In 1976, the Florida Legislature passed the Kissimmee River Restoration Act. As a result, three major restoration and planning studies (first federal feasibility study [1978-1985], the Pool B Demonstration Project [1984-1990], and the second federal feasibility study [1990-present] were initiated (1) to evaluate measures and provide recommendations for restoring floodplain wetlands and improving water quality within the Kissimmee basin, (2) to assess the feasibility of the recommended dechannelization plan, and (3) to evaluate implementation of the dechannelization plan. The recommended plan calls for the backfilling of over 35 km of C-38, recarving of 14 km of river channel, and removal of two water-control structures and associated levees. Restoration of the Kissimmee River ecosystem will result in the reestablishment of 104 km(2) of river-floodplain ecosystem, including 70 km of river channel and 11,000 ha of wetland habitat, which is expected to benefit over 320 species of fish and wildlife.
引用
收藏
页码:149 / 159
页数:11
相关论文
共 34 条
  • [21] TOLAND BR, 1990, 1988 P KISS RIV REST, P83
  • [22] CONCEPTUAL EVALUATION OF FACTORS POTENTIALLY AFFECTING RESTORATION OF HABITAT STRUCTURE WITHIN THE CHANNELIZED KISSIMMEE RIVER ECOSYSTEM
    TOTH, LA
    ARRINGTON, DA
    BRADY, MA
    MUSZICK, DA
    [J]. RESTORATION ECOLOGY, 1995, 3 (03) : 160 - 180
  • [23] TOTH LA, 1990, 1988 P KISS RIV REST, P47
  • [24] Toth Louis A., 1993, Florida Scientist, V56, P25
  • [25] RESTORATION OF THE KISSIMMEE RIVER - A CONCEPTUAL-MODEL OF PAST AND PRESENT FISH COMMUNITIES AND ITS CONSEQUENCES FOR EVALUATING RESTORATION SUCCESS
    TREXLER, JC
    [J]. RESTORATION ECOLOGY, 1995, 3 (03) : 195 - 210
  • [26] VANNOTE RJ, 1971, FIELD EVALUATION
  • [27] WULLSCHLEGER JG, 1990, 1988 P KISS RIV REST, P67
  • [28] 1959, WARDEN FIELD NOTES
  • [29] 1955, WARDEN FIELD NOTES
  • [30] 1949, WARDEN FIELD NOTES