共 31 条
[21]
O'Grady P.J., Menon U., Loading a flexible manufacturing system, International Journal of Production Research, 25, pp. 1053-1068, (1987)
[22]
Rajagopalan S., Formulation and heuristic solutions for parts grouping and tool loading in flexible manufacturing systems, Proceedings of the 2Nd ORSA/TIMS Conference on Flexible Manufacturing Systems, pp. 311-320, (1986)
[23]
Sarin S.C., Chen C.S., The machine loading and tool allocation problem in a flexible manufacturing system, International Journal of Production Research, 25, 7, pp. 1081-1094, (1987)
[24]
Shanker K., Tzen Y., A loading and dispatching problem in a random flexible manufacturing system, International Journal of Production Research, 23, pp. 579-595, (1985)
[25]
Shanthikumar J.G., Stecke K.E., Reducing work in process inventory in certain classes of flexible manufacturing systems, European Journal of Operational Research, 26, pp. 266-271, (1986)
[26]
Smith M.L., Ramesh R., Dudek R.A., Blair E.L., Characteristics of U.S. Flexible manufacturing systems—a survey, Proceedings of the 2Nd ORSA/TIMS Conference on Flexible Manufacturing Systems, pp. 477-486, (1986)
[27]
Stecke K.E., Production Planning for Flexible Manufacturing Systems, (1981)
[28]
Stecke K.E., Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems, Management Science, 29, 3, pp. 273-288, (1983)
[29]
Stecke K.E., Morin T.L., The optimality of balancing workloads in certain types of flexible manufacturing systems, European Journal of Operations Research, 20, pp. 68-82, (1985)
[30]
Stecke K.E., Solberc J.J., The optimality of unbalancing both work-loads and machine group sizes in closed queueing networks of multiple server queues, Operations Research, 33, pp. 882-910, (1985)