OPTIMAL ASSIGNMENT OF SLACK DUE-DATES AND SEQUENCING OF JOBS WITH RANDOM PROCESSING TIMES ON A SINGLE-MACHINE

被引:23
作者
CHENG, TCE
机构
[1] Department of Actuarial and Management Sciences, University of Manitoba, Winnipeg
关键词
SCHEDULING; SEQUENCING; DUE-DATE ASSIGNMENT;
D O I
10.1016/0377-2217(91)90310-R
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper considers the problem of due-date assignment and sequencing of n stochastically independent jobs with random processing times on a single machine. The objective is to find the optimal due-dates, under the slack due-date assignment method, and the optimal job sequence that jointly minimize the expected total cost. This cost is a function of the length of the assigned due-dates and the deviations of job completion times from the due-dates. It is shown that the optimal due-dates can be analytically determined. An efficient algorithm of the order O(n log n) is developed to find the optimal job sequence under mild conditions. It is also shown that, with further suitable and reasonable assumptions, the job sequence in the shortest expected processing time order is optimal.
引用
收藏
页码:348 / 353
页数:6
相关论文
共 23 条
[2]   SURVEY OF SCHEDULING RESEARCH INVOLVING DUE DATE DETERMINATION DECISIONS [J].
CHENG, TCE ;
GUPTA, MC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 38 (02) :156-166
[3]   OPTIMAL DUE-DATE ASSIGNMENT IN A JOB SHOP [J].
CHENG, TCE .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (03) :503-515
[4]   SIMULATION STUDY OF JOB SHOP SCHEDULING WITH DUE DATES [J].
CHENG, TCE .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1988, 19 (03) :383-390
[5]   ANALYTICAL DETERMINATION OF OPTIMAL TWK DUE-DATES IN A JOB SHOP [J].
CHENG, TCE .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1985, 16 (06) :777-787
[6]  
CHENG TCE, 1984, J OPER RES SOC, V35, P433
[7]  
CONWAY RW, 1965, J IND ENGINEERING, V16, P228
[8]  
CONWAY RW, 1967, SCHEDULING THEORY
[9]  
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
[10]  
ELVERS DA, 1973, J AM PRODUCTION INVE, V14, P62