Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in construction

被引:12
作者
Chan, Joseph [1 ]
Chan, Daniel [1 ]
Chan, Albert [1 ]
Lam, Patrick [1 ]
Yeung, John [2 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong, Peoples R China
[2] Hong Kong Baptist Univ, Coll Int Educ, Sch Continuing Educ, Sha Tin, Hong Kong, Peoples R China
关键词
Contracts; Target costs; Risk assessment; Hong Kong; Construction industry;
D O I
10.1108/14725961111105709
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - The purpose of this paper is to develop a fuzzy risk assessment model for construction projects procured with target cost contracts (TCC) and guaranteed maximum price (GMP) contracts using factor analysis (FA) and fuzzy synthetic evaluation method, based on an empirical questionnaire survey with relevant industrial practitioners in Hong Kong. Design/methodology/approach - A total of 34 key risk factors (RFs) inherent with TCC/GMP contracts were identified through an extensive literature review and a series of structured interviews. A questionnaire survey was then launched to solicit the opinions of industrial practitioners on risk assessment of such RFs. Findings - The most important 17 principal RFs after the calculation of normalised values were selected for undertaking FA. Five principal risk groups (PRGs) were then generated in descending order of importance as: design risks, pre-contract risks, economic and financial risks, lack of experience in TCC/GMP procurement process and post-contract risks. These survey findings also reveal that design risks may be the major hurdle to the success of TCC/GMP projects in Hong Kong. Originality/value - An overall risk index (ORI) associated with TCC/GMP construction projects and the risk indices of individual PRGs can be generated from the model for reference. An objective and reliable assessment can be achieved. The model provides a solid platform to measure, evaluate and reduce the risk levels of TCC/GMP projects based on objective evidence instead of subjective judgments. The research methodology could be replicated in other countries or regions to produce similar models for international comparisons and the assessment of risk levels for different types of TCC/GMP projects worldwide.
引用
收藏
页码:34 / +
页数:19
相关论文
共 37 条
[1]   COGNITIVE SCREENING OF NURSING-HOME RESIDENTS - FACTOR STRUCTURES OF THE MINI-MENTAL-STATE-EXAMINATION [J].
ABRAHAM, IL ;
MANNING, CA ;
SNUSTAD, DG ;
BRASHEAR, HR ;
NEWMAN, MC ;
WOFFORD, AB .
JOURNAL OF THE AMERICAN GERIATRICS SOCIETY, 1994, 42 (07) :750-756
[2]   The selection of sharing ratios in target cost contracts [J].
Badenfelt, Ulrika .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2008, 15 (01) :54-+
[3]   Incentive mechanisms for project success [J].
Bower, D ;
Ashby, G ;
Gerald, K ;
Smyk, W .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (01) :37-43
[4]  
Broome J., 2002, INT J PROJ MANAG, V20, P59, DOI DOI 10.1016/S0263-7863(00)00035-1
[5]  
CANTIRINO J, 1999, J CORPORATE REAL EST, V1, P169, DOI DOI 10.1108/14630019910811015
[6]  
Chan D.W.M., 2010, CONSTRUCTION LAW J, V26, P364
[7]   Evaluating Guaranteed Maximum Price and Target Cost Contracting Strategies in Hong Kong Construction Industry [J].
Chan, Daniel ;
Chan, Albert ;
Lam, Patrick ;
Lam, Edmond ;
Wong, James .
JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2007, 12 (03) :139-+
[8]  
Chan DWM, 2008, PROCEEDINGS OF CRIOCM 2008 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCES OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, P285
[9]  
Cox A., 1998, STRATEGIC PROCUREMEN
[10]   The factor structure for the Positive and Negative Syndrome Scale (PANSS) in recent-onset psychosis [J].
Emsley, R ;
Rabinowitz, J ;
Torreman, M .
SCHIZOPHRENIA RESEARCH, 2003, 61 (01) :47-57