A HEURISTIC FOR MULTI-PROJECT SCHEDULING WITH LIMITED RESOURCES IN THE HOUSING INDUSTRY

被引:38
作者
TSUBAKITANI, S [1 ]
DECKRO, RF [1 ]
机构
[1] UNIV WYOMING,COLL COMMERCE & IND,DEPT BUSINESS ADM,LARAMIE,WY 82071
关键词
HEURISTIC; MULTI-PROJECT SCHEDULING; CONTROL; LIMITED RESOURCES; HOUSING INDUSTRY;
D O I
10.1016/0377-2217(90)90122-R
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A heuristic scheduling and control model is developed for the multi-project, resource constrained scheduling environment. The model is developed from actual firm data using the Kurtulus and Davis approach to select appropriate heuristic decision rules. Resource profiles, calculation of multi-project resource constrained slack and the schedule are outputs of the model. A routine to update current projects status is provided with this model for control purposes in an ongoing operational environment. While developed for the housing industry, the modelling approach has broad application in a number of multi-project environments.
引用
收藏
页码:80 / 91
页数:12
相关论文
共 22 条
[1]  
ASSAD AA, 1986, COMPUTERS OPERATIONS, V12, P231
[2]  
BANKS F, IBM PC APPLICATION I
[3]  
Daellenbach H. G., 1978, INTRO OPERATIONS RES
[4]  
DAVIS EW, 1974, J CONSTRUCT DIV-ASCE, V100, P39
[5]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[6]  
DAVIS EW, 1973, AIEE T, P129
[7]  
DECKRO RF, 1986, DECOMPOSITION APPROA
[8]   CONSTRUCTION SCHEDULING SYSTEM WITH RESOURCE-ALLOCATION FOR ELECTRIC UTILITIES [J].
ECONOMIDES, SC ;
DUESTERHOEFT, WC .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1977, 24 (01) :2-7
[9]  
FENDLEY LG, 1968, J IND ENGINEERING, V19, P505
[10]   MULTI-PROJECT SCHEDULING - CATEGORIZATION OF HEURISTIC RULES PERFORMANCE [J].
KURTULUS, I ;
DAVIS, EW .
MANAGEMENT SCIENCE, 1982, 28 (02) :161-172