SCHEDULING A 2-STAGE HYBRID FLOWSHOP WITH SEPARABLE SETUP AND REMOVAL TIMES

被引:62
作者
GUPTA, JND
TUNC, EA
机构
[1] Department of Management, Ball State University, Muncie
关键词
D O I
10.1016/0377-2217(94)90407-3
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper considers the two-stage flowshop scheduling problem where each stage consists of several identical parallel machines and the setup and removal times of each job at each stage are separated from the processing times. A polynomial optimization algorithm is developed for the special case where the first stage contains only one machine and the number of identical parallel machines at the second stage is equal to or greater than the total number of jobs. In view.of the NP-completeness of this problem, four heuristic algorithms are developed for the case where there is one machine at stage 1 and the number of identical parallel machines at the second stage is less than the total number of jobs. The proposed heuristic algorithms are empirically tested to determine their effectiveness in finding, an optimal schedule.
引用
收藏
页码:415 / 428
页数:14
相关论文
共 18 条
[1]   SCHEDULING GROUPS OF JOBS IN THE 2-MACHINE FLOW-SHOP [J].
BAKER, KR .
MATHEMATICAL AND COMPUTER MODELLING, 1990, 13 (03) :29-36
[2]  
BRAH S, 1991, J INFORMATION OPTIMI, V12, P113
[3]   BRANCH AND BOUND ALGORITHM FOR THE FLOW-SHOP WITH MULTIPLE PROCESSORS [J].
BRAH, SA ;
HUNSUCKER, JL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) :88-99
[4]  
Deal D. E., 1991, Journal of Information & Optimization Sciences, V12, P407
[5]   JOB LATENESS IN A 2-MACHINE FLOWSHOP WITH SETUP TIMES SEPARATED [J].
DILEEPAN, P ;
SEN, T .
COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (06) :549-556
[6]  
Garey MR., 1979, COMPUTERS INTRACTABI
[7]   SCHEDULES FOR A 2-STAGE HYBRID FLOWSHOP WITH PARALLEL MACHINES AT THE 2ND STAGE [J].
GUPTA, JND ;
TUNC, EA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (07) :1489-1502
[8]   2-STAGE, HYBRID FLOWSHOP SCHEDULING PROBLEM [J].
GUPTA, JND .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1988, 39 (04) :359-364
[9]  
GUPTA JND, 1979, DISAGGREGATION PROBL, P363
[10]   PERFORMANCE OF PRIORITY RULES IN A DUE DATE FLOW-SHOP [J].
HUNSUCKER, JL ;
SHAH, JR .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1992, 20 (01) :73-89