SCHEDULING GROUPS OF JOBS IN THE 2-MACHINE FLOW-SHOP

被引:64
作者
BAKER, KR
机构
[1] The Amos Tuck School of Business Administration, Dartmouth College, Hanover
关键词
D O I
10.1016/0895-7177(90)90368-W
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper provides a review of the two-machine flow shop model when time lags or setups are introduced. Building on these results, it establishes a general framework for scheduling groups of jobs when each group requires a setup. © 1990.
引用
收藏
页码:29 / 36
页数:8
相关论文
共 14 条
[1]  
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[2]  
Conway RW., 1967, THEORY SCHEDULING
[3]  
Ham I., 1985, GROUP TECHNOLOGY
[4]  
Johnson S.M., 1954, NAV RES LOG, V1, P61, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110]
[5]  
Kan A. R., 2012, MACHINE SCHEDULING P, DOI DOI 10.1016/0377-2217(77)90029-7
[6]  
KURISU T, 1976, J OPER RES SOC JPN, V19, P1
[7]   GENERAL BOUNDING SCHEME FOR PERMUTATION FLOW-SHOP PROBLEM [J].
LAGEWEG, BJ ;
LENSTRA, JK ;
RINNOOYKAN, AHG .
OPERATIONS RESEARCH, 1978, 26 (01) :53-67
[8]   SEQUENCING N-JOBS ON 2 MACHINES WITH ARBITRARY TIME LAGS [J].
MITTEN, LG .
MANAGEMENT SCIENCE, 1959, 5 (03) :293-298
[9]   JOB SCHEDULING IN A GROUP TECHNOLOGY ENVIRONMENT FOR A SINGLE FACILITY [J].
OZDEN, M ;
EGBELU, PJ ;
IYER, AV .
COMPUTERS & INDUSTRIAL ENGINEERING, 1985, 9 (01) :67-72
[10]   FLOWSHOP PROBLEMS WITH TIME LAGS [J].
SZWARC, W .
MANAGEMENT SCIENCE, 1983, 29 (04) :477-481