EARLY TARDY COST TRADE-OFFS IN RESOURCE CONSTRAINED PROJECTS WITH CASH FLOWS - AN OPTIMIZATION-GUIDED HEURISTIC APPROACH

被引:34
作者
PADMAN, R [1 ]
SMITHDANIELS, DE [1 ]
机构
[1] ARIZONA STATE UNIV,COLL BUSINESS,DEPT DECIS & INFORMAT SYST,TEMPE,AZ 85287
关键词
PROJECT SCHEDULING; PLANNING; RESOURCE ALLOCATION; HEURISTICS;
D O I
10.1016/0377-2217(93)90184-O
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we consider the Resource Constrained Project Scheduling Problem with the objective of maximizing the Net Present Value of project cash flows. We present eight greedy heuristics, embedded in a single-pass, forward algorithm that uses information from a relaxed optimization model to schedule activities. In contrast to our previous research, activities are released for scheduling when they are precedence feasible. The heuristics require the evaluation of the earliness costs and tardiness penalties for each activity that are provided by the relaxed optimization model. We compare the performance of these heuristics to that of heuristics selected from our earlier research that delay the consideration of an activity for scheduling until the activities' target time specified by the optimization model becomes current. The results of a series of experiments across 144 different experimental environments indicate that the early release heuristics provide superior NPV results in many project environments.
引用
收藏
页码:295 / 311
页数:17
相关论文
共 27 条
[21]  
Smith-Daniels D. E., 1987, J OPER MANAG, V7, P33
[22]  
SMITHDANIELS DE, 1987, DECISION SCI, V17, P617
[23]  
TAVARES LV, 1990, EUR J OPER RES, V49, P92, DOI 10.1016/0377-2217(90)90123-S
[24]   OPTIMAL RESOURCE PROFILES FOR PROGRAM SCHEDULING [J].
TAVARES, LV .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (01) :83-90
[25]   MULTICRITERIA SCHEDULING OF A RAILWAY RENEWAL PROGRAM [J].
TAVARES, LV .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 25 (03) :395-405
[26]   CRITICAL PATH-ANALYSIS AND RESOURCE CONSTRAINED PROJECT SCHEDULING - THEORY AND PRACTICE [J].
WILLIS, RJ .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1985, 21 (02) :149-155
[27]  
YANG KK, 1990, 2ND P INT WORKSH PRO, P384