共 31 条
[21]
Taha, Skeith, The economic lotsizes in multi-stage production systems, IIE Trans., 2, pp. 157-162, (1970)
[22]
Schwarz, Schrage, Optimal and system myopic policies for multi-echelon production/inventory assembly systems, Management Science, 21, pp. 1285-1294, (1975)
[23]
Graves, Schwarz, Single cycle continuous review policies for arborescent production/inventory systems, Manage. Sci., 23, pp. 529-540, (1977)
[24]
Bigham, Mogg, Converging branch multi-stage production schedules with finite production rates and start-up delays, J. Opl. Res. Soc., 30, pp. 737-745, (1979)
[25]
Moily, Optimal and heuristic procedures for component lot-splitting in multi-stage manufacturing systems, Manage. Sci., 32, pp. 113-125, (1986)
[26]
Burns, Hall, Blumenfeld, Daganzo, Distribution strategies that minimize transportation and inventory costs, Oper. Res., 33, pp. 469-490, (1985)
[27]
Benjamin, An analysis of inventory and transportation costs in a constrained network, Trans. Sci., 23, pp. 177-183, (1989)
[28]
Blumenfeld, Burns, Daganzo, Synchronizing production and transportation schedules, Trans. Res., 25 B, pp. 23-37, (1991)
[29]
Benjamin, An analysis of mode choice for shippers in a constrained network with applications to just-in-time inventory, Trans. Res., 24 B, pp. 229-245, (1990)
[30]
Blumenfeld, Burns, Diltz, Daganzo, Analyzing trade-offs between transportation, inventory, and production costs on freight networks, Trans. Res., 19 B, pp. 361-380, (1985)