PLANNING LOT SIZES AND CAPACITY REQUIREMENTS IN A SINGLE STAGE PRODUCTION SYSTEM

被引:24
作者
GUNTHER, HO
机构
关键词
D O I
10.1016/0377-2217(87)90026-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:223 / 231
页数:9
相关论文
共 24 条
[11]  
Karni R., 1981, PRODUCTION INVENTORY, V22, P91
[12]  
KNOLMAYER G, 1985, 1984 OP RES P BERL, P223
[13]  
LAMBRECHT MR, 1979, AIIE T, V11, P319, DOI 10.1080/05695557908974478
[14]  
NEWSON PE, 1975, MANAGE SCI, V21, P1186
[15]   ON A FORMALIZATION OF THE PROCESS OF QUANTITATIVE MODEL-BUILDING [J].
SCHNEEWEISS, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (01) :24-41
[17]  
SILVER EA, 1973, PRODUCTION INVENTORY, V14, P64
[18]  
SILVER EA, 1978, 21ST AM PROD INV CON, P818
[19]   MULTI-ITEM LOT SIZE DETERMINATION AND SCHEDULING UNDER CAPACITY CONSTRAINTS [J].
VANNUNEN, JAEE ;
WESSELS, J .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1978, 2 (01) :36-41
[20]   PLANNING PRODUCTION IN A BOTTLENECK DEPARTMENT [J].
VANWASSENHOVE, LN ;
VANDERHENST, P .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1983, 12 (02) :127-137