[9]
Improved 0–1 programming model for optimal flow scheduling in irrigation canals.[J].Zhi Wang;J. Mohan Reddy;J. Feyen.Irrigation and Drainage Systems.1995, 2
[9]
Improved 0–1 programming model for optimal flow scheduling in irrigation canals.[J].Zhi Wang;J. Mohan Reddy;J. Feyen.Irrigation and Drainage Systems.1995, 2