共 29 条
[11]
Collaborative incentive contracts: stimulating competitive behaviour without competition[J] . Sa?d Boukendour,Will Hughes.Construction Management and Economics . 2014 (3)
[12]
A comprehensive framework for evaluating key project requirements[J] . Li-Ren Yang,Jieh-Haur Chen,Chung-Fah Huang.Journal of Civil Engineering and Management . 2013 (sup1)
[13]
A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project[J] . Santosh Mungle,Lyes Benyoucef,Young-Jun Son,M.K. Tiwari.Engineering Applications of Artificial Intelligence . 2013 (8)
[16]
Sharing Tacit Knowledge for Integrated Project Team Flexibility: Case Study of Integrated Project Delivery[J] . Lianying Zhang,Jing He,Shuguo Zhou.Journal of Construction Engineering and Management . 2013 (7)
[17]
Target value design: using collaboration and a lean approach to reduce construction cost[J] . Daria Zimina,Glenn Ballard,Christine Pasquire.Construction Management and Economics . 2012 (5)
[18]
The impact of incentive mechanisms on project performance[J] . Xianhai Meng,Brendan Gallagher.International Journal of Project Management . 2011 (3)
[19]
Vertical governance of construction projects: an information cost perspective[J] . Kaixun Sha.Construction Management and Economics . 2011 (11)
[20]
Preferred risk allocation in target cost contracts in construction[J] . Joseph H.L. Chan,Daniel W.M. Chan,Patrick T.I. Lam,Albert P.C. Chan.Facilities . 2011 (13)