共 19 条
- [11] 明挖法对既有大直径盾构隧道影响保护的理论与实践[M]. 同济大学出版社 , 孙巍, 2014
- [12] Longitudinal structural modelling of shield tunnels considering shearing dislocation between segmental rings[J] . Huai-Na Wu,Shui-Long Shen,Shao-Ming Liao,Zhen-Yu Yin.Tunnelling and Underground Space Technology incor . 2015
- [13] Three-dimensional numerical parametric study of the influence of basement excavation on existing tunnel[J] . Jiangwei Shi,C.W.W. Ng,Yonghui Chen.Computers and Geotechnics . 2015
- [14] Novel Excavation and Construction Method of an Underground Highway Tunnel above Operating Metro Tunnels[J] . Jin-Jian Chen,Yan-Fei Zhu,Ming-Guang Li,Suo-Lin Wen.Journal of Aerospace Engineering . 2014
- [15] Evaluation of deformation response for adjacent tunnels due to soil unloading in excavation engineering[J] . Zhiguo Zhang,Maosong Huang,Weidong Wang.Tunnelling and Underground Space Technology incor . 2013
- [16] Prediction of tunnel displacement induced by adjacent excavation in soft soil[J] . Jun-Feng Zhang,Jin-Jian Chen,Jian-Hua Wang,Yan-Fei Zhu.Tunnelling and Underground Space Technology incorporating Trenchless Technology Research . 2013
- [19] Tunnel complex unloaded by a deep excavation[J] . Computers and Geotechnics . 2001 (6)