Proactive heuristic procedures for robust project scheduling: An experimental analysis[J] . Stijn Van de Vonder,Erik Demeulemeester,Willy Herroelen. European Journal of Operational Research . 2006 (3)
[3]
The use of buffers in project management: The trade-off between stability and makespan[J] . Stijn Van de Vonder,Erik Demeulemeester,Willy Herroelen,Roel Leus. International Journal of Production Economics . 2004 (2)
[4]
Constraint-based schedule repair for product development projects with time-limited constraints[J] . Juite Wang. International Journal of Production Economics . 2004 (3)
[5]
A bi-objective model for robust resource-constrained project scheduling[J] . M.A. Al-Fawzan,Mohamed Haouari. International Journal of Production Economics . 2004 (2)
[6]
An investigation of buffer sizing techniques in critical chain scheduling[J] . Oya I. Tukel,Walter O. Rom,Sandra Duni Eksioglu. European Journal of Operational Research . 2004 (2)
[7]
Project scheduling under uncertainty: Survey and research potentials[J] . Willy Herroelen,Roel Leus. European Journal of Operational Research . 2004 (2)
[8]
The construction of stable project baseline schedules[J] . Willy Herroelen,Roel Leus. European Journal of Operational Research . 2003 (3)