共 15 条
[1]
自动化集装箱码头装卸工艺系统比较研究.[J].郑见粹;李海波;谢文宁;李志建;杨瑞;.水运科学研究.2011, 02
[2]
[3]
[4]
[5]
Mathematical optimization for earliness/tardiness minimization in a multiple automated guided vehicle manufacturing system via integrated heuristic algorithms.[J].Hamed Fazlollahtabar;Mohammad Saidi-Mehrabad;Jaydeep Balakrishnan.Robotics and Autonomous Systems.2015,
[6]
Modelling of dual-cycle strategy for container storage and vehicle scheduling problems at automated container terminals.[J].Jiabin Luo;Yue Wu.Transportation Research Part E.2015,
[7]
A genetic algorithm for optimization of integrated scheduling of cranes; vehicles; and storage platforms at automated container terminals.[J].Seyed Mahdi Homayouni;Sai Hong Tang;Omid Motlagh.Journal of Computational and Applied Mathematics.2014,
[10]
The Selection of the Best Control Rule for a Multiple-Load AGV System Using Simulation and Fuzzy MADM in a Flexible Manufacturing System.[J].Parham Azimi;Hasan Haleh;Mehran Alidoost;Petr Musilek.Modelling and Simulation in Engineering.2010,

