Off-Stream Detention Design for Storm-Water Management

被引:9
作者
Guo, James C. Y. [1 ]
机构
[1] Univ Colorado, Dept Civil Engn, Denver, CO 80217 USA
关键词
Off-stream detention basin; Storm-water; Flood gate; Culvert; Flow diversion;
D O I
10.1061/(ASCE)IR.1943-4774.0000406
中图分类号
S2 [农业工程];
学科分类号
0828 ;
摘要
A detention basin is designed for storm-water quantity and quality controls. An in-stream basin is often located on a widened floodplain, whereas an off-stream basin can be part of open space in a parking lot, park, or sport field. The inflow channel associated with an off-stream basin is allowed to carry its base flow not to exceed the downstream capacity. When the inflow channel is full, the excess flood water is diverted into the off-stream basin through the side weir. During the flood recession, the equalizer conduit drains the basin flow back to the channel. In this study, the rational volumetric method was expanded from in-stream to off-stream detention design. The required off-stream detention volume is maximized by the rainfall event longer than the time of concentration of the tributary area. In comparison, the off-stream detention volume can be significantly less than an in-stream, depending on the flow-through capacity in the downstream channel. This paper presents a design procedure to maximize the off-stream detention volume, to size the flow-diversion weir, and to set the floodgate operation on the equalizer conduit. The simplified derivation on the turning moment indicates that the operation of a floodgate is dictated by the water depth differential and the weight of the gate. DOI: 10.1061/(ASCE)IR.1943-4774.0000406. (C) 2012 American Society of Civil Engineers.
引用
收藏
页码:371 / 376
页数:6
相关论文
共 16 条
[11]  
Malcom H. Rooney, 1982, ASCE P C STORMW DET
[12]  
McCuen R. H, 1998, HYDROLOGIC ANAL DESI
[13]  
Rossman L.A., 2005, Storm water management model-User's manual
[14]  
SKIPWITH W, 1990, CIVIL ENG, V60, P54
[15]  
UDFCD, 2001, URB STORMW DES CRIT, V1-2
[16]  