Methodology of using delay-time analysis for a manufacturing industry

被引:48
作者
Jones, B. [1 ]
Jenkinson, I. [1 ]
Wang, J. [1 ]
机构
[1] Liverpool John Moores Univ, Liverpool L3 3AF, Merseyside, England
关键词
Maintenance; Inspection maintenance; Environment; Delay-time; PREVENTIVE MAINTENANCE; OPTIMAL INSPECTION; SPACE-SHUTTLE; OPTIMIZATION; MODELS; TILES;
D O I
10.1016/j.ress.2007.12.005
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper has been written to give a methodology of applying delay-time analysis to a maintenance and inspection department. The aim is to reduce downtime of plant items and/or reducing maintenance and inspection costs, taking into account the possible environmental impact of a failure in terms of cost, both to the cornpany and the environment. The paper also attempts to give a subjective measure of the consequences of such a failure in terms of cost to the environment, in monetary value to the company and the damaging effect to the company image. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:111 / 124
页数:14
相关论文
共 19 条
[11]   Optimal maintenance decisions under imperfect inspection [J].
Kallen, MJ ;
van Noortwijk, JM .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2005, 90 (2-3) :177-185
[12]  
LEUNG F, 1996, INT J OPER PROD MAN, V6, P98
[13]   Variance decomposition-based sensitivity analysis via neural networks [J].
Marseguerra, M ;
Masini, R ;
Zio, E ;
Cojazzi, G .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2003, 79 (02) :229-238
[14]   PRA AS A MANAGEMENT TOOL - ORGANIZATIONAL-FACTORS AND RISK-BASED PRIORITIES FOR THE MAINTENANCE OF THE TILES OF THE SPACE-SHUTTLE ORBITER [J].
PATECORNELL, E ;
FISCHBECK, PS .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1993, 40 (03) :239-257
[15]   PROBABILISTIC RISK ANALYSIS AND RISK-BASED PRIORITY SCALE FOR THE TILES OF THE SPACE-SHUTTLE [J].
PATECORNELL, E ;
FISCHBECK, PS .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1993, 40 (03) :221-238
[16]  
Pillay A, 2001, MAR TECHNOL SNAME N, V38, P122
[17]  
PILLAY A, 2003, TECHNOLOGY SAFETY MA, P149
[18]   Risk-informed optimisation of railway tracks inspection and maintenance procedures [J].
Podofillini, L ;
Zio, E ;
Vatn, J .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (01) :20-35
[19]   Reliability evaluation and optimisation of imperfect inspections for a component with multi-defects [J].
Zhao, Jianmin ;
Chan, A. H. C. ;
Roberts, C. ;
Madelin, K. B. .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2007, 92 (01) :65-73