Workflow structuring and reengineering method for design process

被引:11
作者
Lee, Heejung [1 ]
Suh, Hyo-Won [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Dept Ind Engn, Taejon 305701, South Korea
关键词
design process; workflow; reengineering;
D O I
10.1016/j.cie.2006.08.016
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A short lead time for product commercialization is a critical advantage in the era of highly challenging competitions. It is more difficult, however, to shorten the design process rather than manufacturing process since the underlying design activities in process and related data are often interlinked and quite uncertain, and the attempts to perform the design activities concurrently increase the complexity of the design process. In case the targeting process is well-structured and easy to be managed, many approaches have been proposed and it is the best way to use the well-known reengineering method such as crashing the bottle-neck activity. However, they have only concerned mainly about well-defined procedures, not an operational-level sophisticated workflow. As a means to effectively manage and accelerate the design process, a process or workflow model needs to define complex relations such as iteration or coupled dependency in design process in order to coordinate the sophisticated process effectively. And, the acceleration approaches based on the operational-level information needs to be discussed. Firstly, in order to develop an appropriate model that effectively captures the operational-level characteristics in design process, we define the workflow including the control and data flow with an incidence matrix called Workflow Matrix (WfM). Secondly, a workflow structuring method is developed for identifying the reengineering issue and it also transform the complex design process into a well-structured workflow. Finally, we analyze the design process with WfM and suggest reengineering strategies to improve the design process. (c) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:698 / 714
页数:17
相关论文
共 19 条
[1]  
Ballard G., 1999, P 7 ANN C INT GROUP, P275
[2]  
BROWNING TR, 1998, P 5 ISPE INT C CONC, P15
[3]  
Deo N., 1974, GRAPH THEORY APPL EN, V1st
[4]   A MODEL-BASED METHOD FOR ORGANIZING TASKS IN PRODUCT DEVELOPMENT [J].
EPPINGER, SD ;
WHITNEY, DE ;
SMITH, RP ;
GEBALA, DA .
RESEARCH IN ENGINEERING DESIGN-THEORY APPLICATIONS AND CONCURRENT ENGINEERING, 1994, 6 (01) :1-13
[5]   EFFECTS OF CONCURRENT ENGINEERING ON MAKE-TO-ORDER PRODUCTS [J].
HANDFIELD, RB .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1994, 41 (04) :384-393
[6]  
JEFFREY KL, 1996, IEEE T ENG MANAGE, V43, P165
[7]  
Kamath M., 1996, Distributed Systems Engineering, V3, P213, DOI 10.1088/0967-1846/3/4/002
[8]  
KEHAT E, 1997, PROCESS TECHNOLOGY I, V18, P115
[9]   Managing the simultaneous execution of coupled phases in concurrent product development [J].
Krishnan, V .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1996, 43 (02) :210-217
[10]   REENGINEERING OF DESIGN AND MANUFACTURING PROCESSES [J].
KUSIAK, A ;
LARSON, TN ;
WANG, JR .
COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 26 (03) :521-536