共 10 条
- [1] Scheduling cost optimization and neural dynamics model for construction [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (04): : 450 - 458
- [3] Adeli H., 1998, Neurocomputing in Design Automation
- [4] Fowler M., 1997, ANAL PATTERNS REUSAB
- [5] Fowler M., 1997, UML DISTILLED APPLYI
- [6] Gamma E., 1995, Design Patterns: Elements of Reusable Object-Oriented Software, V206, P395
- [7] CONSCOM: An OO construction scheduling and change management system [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (05): : 368 - 376
- [8] ODENTHAL G, 1997, P 11 EUR C OBJ OR PR, P511