Concurrent operations assignment and sequencing for particular assembly problems in flow lines

被引:9
作者
Agnetis, A
Arbib, C
机构
[1] UNIV ROMA LA SAPIENZA,DIPARTIMENTO INFORMAT & SISTEMIST,I-00185 ROME,ITALY
[2] UNIV AQUILA,DIPARTIMENTO MATEMAT PURA & APPLICATA,I-67010 COPPITO AQUILA,AQUILA,ITALY
关键词
Buffer Capacity; Flow Line; Productivity Index; Precedence Constraint; Dynamic Programming Algorithm;
D O I
10.1023/A:1018916608787
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 [运筹学与控制论]; 12 [管理学]; 1201 [管理科学与工程]; 1202 [工商管理学]; 120202 [企业管理];
摘要
In this paper, we deal with the problem of optimally assigning and sequencing the operations of a set of jobs to the machines of a flow line. The operations of each job are to be executed according to the precedence constraints specified by the operation graph. Here, we analyze the special case in which the assembly operations are strictly ordered. The problem consists in assigning the operations to the machines and sequencing them so that some productivity index is maximized. The model proposed fits in particular situations where few identical product items requiring a large amount of operations are to be produced, and accounts for such issues as: limited buffer capacity, FCFS versus LCFS buffer operation, set-up and transportation times, machines with different speeds, tools and tool magazine restrictions. In this scenario, polynomial-time dynamic programming algorithms for makespan or inventory costs minimization are proposed.
引用
收藏
页码:1 / 31
页数:31
相关论文
共 7 条
[1]
AGNETIS A, 1990, P 2 INT C CIM TROY M
[2]
AGNETIS A, 1995, IEEE T ROBOTIC AUTOM, V1, P1
[3]
AGNETIS A, 1997, IN PRESS ANN OPERATI
[4]
THE LESSONS OF FLOWSHOP SCHEDULING RESEARCH [J].
DUDEK, RA ;
PANWALKAR, SS ;
SMITH, ML .
OPERATIONS RESEARCH, 1992, 40 (01) :7-13
[5]
French S., 1982, Sequencing and Scheduling
[6]
A COMPREHENSIVE LITERATURE-REVIEW AND ANALYSIS OF THE DESIGN, BALANCING AND SCHEDULING OF ASSEMBLY SYSTEMS [J].
GHOSH, S ;
GAGNON, RJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (04) :637-670
[7]
SEQUENCING IN AN ASSEMBLY LINE WITH BLOCKING TO MINIMIZE CYCLE TIME [J].
MCCORMICK, ST ;
PINEDO, ML ;
SHENKER, S ;
WOLF, B .
OPERATIONS RESEARCH, 1989, 37 (06) :925-935