SEQUENCING IN AN ASSEMBLY LINE WITH BLOCKING TO MINIMIZE CYCLE TIME

被引:219
作者
MCCORMICK, ST
PINEDO, ML
SHENKER, S
WOLF, B
机构
[1] COLUMBIA UNIV,IND ENGN & OPERAT RES,NEW YORK,NY 10027
[2] XEROX CORP,PALO ALTO RES CTR,PALO ALTO,CA 94304
[3] XEROX CORP RES CTR,N TARRYTOWN,NY
关键词
D O I
10.1287/opre.37.6.925
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:925 / 935
页数:11
相关论文
共 18 条
[1]   PERFORMANCE OF HIERARCHICAL PRODUCTION SCHEDULING POLICY [J].
AKELLA, R ;
CHOONG, Y ;
GERSHWIN, SB .
IEEE TRANSACTIONS ON COMPONENTS HYBRIDS AND MANUFACTURING TECHNOLOGY, 1984, 7 (03) :225-240
[3]  
COHEN G, 1983, 22ND P IEEE C DEC CO
[4]  
CUNNINGHAMEGREE.RA, 1962, OPER RES Q, V13, P95
[5]  
CUNNINGHAMEGREE.RH, 1976, MATH PROGRAM, V10, P111
[6]   SHORT-TERM PRODUCTION SCHEDULING OF AN AUTOMATED MANUFACTURING FACILITY [J].
GERSHWIN, SB ;
AKELLA, R ;
CHOONG, YF .
IBM JOURNAL OF RESEARCH AND DEVELOPMENT, 1985, 29 (04) :392-400
[7]   MAXIMUM FLOW IN (S,T) PLANAR NETWORKS [J].
HASSIN, R .
INFORMATION PROCESSING LETTERS, 1981, 13 (03) :107-107
[8]  
HITZ KL, 1979, MIT LIDSTH1063 LAB I
[9]  
HITZ KL, 1980, MIT LIDSR879 LAB INF
[10]  
Hu T.C., 1969, INTEGER PROGRAMMING