SHORT-TERM PRODUCTION SCHEDULING OF AN AUTOMATED MANUFACTURING FACILITY

被引:63
作者
GERSHWIN, SB
AKELLA, R
CHOONG, YF
机构
[1] MIT,DEPT MECH ENGN,CAMBRIDGE,MA 02139
[2] MIT,DEPT ELECT ENGN & COMP SCI,CAMBRIDGE,MA 02139
关键词
D O I
10.1147/rd.294.0392
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
6
引用
收藏
页码:392 / 400
页数:9
相关论文
共 6 条
[1]   PERFORMANCE OF HIERARCHICAL PRODUCTION SCHEDULING POLICY [J].
AKELLA, R ;
CHOONG, Y ;
GERSHWIN, SB .
IEEE TRANSACTIONS ON COMPONENTS HYBRIDS AND MANUFACTURING TECHNOLOGY, 1984, 7 (03) :225-240
[2]  
AKELLA R, 1985, LIDSR1485 MIT LAB IN
[3]  
GERSHWIN SB, 1984, LIDSFR1356 MIT LAB I
[4]   AN ALGORITHM FOR THE COMPUTER CONTROL OF A FLEXIBLE MANUFACTURING SYSTEM [J].
KIMEMIA, J ;
GERSHWIN, SB .
IIE TRANSACTIONS, 1983, 15 (04) :353-362
[5]  
KIMEMIA JG, 1982, LIDSTH1215 MIT LAB I
[6]  
LUENBERGER DG, 1977, INTRO LINEAR NONLINE