Economic allocation of test times for subsystem-level reliability growth testing

被引:32
作者
Coit, DW [1 ]
机构
[1] Rutgers State Univ, Dept Ind Engn, Piscataway, NJ 08854 USA
关键词
D O I
10.1080/07408179808966571
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the development of new electronic systems the planning of reliability growth tests has become both more critical and more difficult as available testing budgets have diminished. Previously, system designers were able to plan and implement relatively lengthy reliability growth test plans to assist in the development of reliable systems. A new method is presented to allocate subsystem reliability growth test time in order to maximize the system mean time between failure (MTBF) or system reliability when designers are confronted with limited testing resources. For certain problems, the algorithm yields the same results as competing approaches to the problem but with significantly fewer required iterations. More significantly, the new algorithm applies to a larger problem domain compared to analogous algorithms. Much more realistic formulations of the problem can now be solved optimally. The algorithm is based on objective function gradient information projected onto a feasible region that consists of candidate test plans given the testing budget constraint. The algorithm is demonstrated on several examples with superior results.
引用
收藏
页码:1143 / 1151
页数:9
相关论文
共 29 条
[1]   LOWER CONFIDENCE BOUND ON THE PERCENTAGE IMPROVEMENT IN COMPARING 2 FAILURE RATES [J].
ANGUS, JE .
IEEE TRANSACTIONS ON RELIABILITY, 1992, 41 (02) :239-240
[2]  
Bazaraa MokhtarS., 1979, Nonlinear Programming: Theory and Algorithms
[3]   UNREPLICATED EXPERIMENTAL-DESIGNS IN RELIABILITY-GROWTH PROGRAMS [J].
BENSKI, C ;
CABAU, E .
IEEE TRANSACTIONS ON RELIABILITY, 1995, 44 (02) :199-205
[4]   A conservative theory for long term reliability growth prediction [J].
Bishop, PG ;
Bloomfield, RE .
SEVENTH INTERNATIONAL SYMPOSIUM ON SOFTWARE RELIABILITY ENGINEERING, PROCEEDINGS, 1996, :308-317
[5]   Reliability evaluation: A field experience from Motorola's cellular Base Transceiver Systems [J].
Bothwell, R ;
Donthamsetty, R ;
Kania, Z ;
Wesoloski, R .
ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1996 PROCEEDINGS, 1996, :348-359
[6]   A BAYES PROCEDURE FOR ESTIMATION OF CURRENT SYSTEM RELIABILITY [J].
CALABRIA, R ;
GUIDA, M ;
PULCINI, G .
IEEE TRANSACTIONS ON RELIABILITY, 1992, 41 (04) :616-620
[7]  
CAMPBELL CL, 1990, P 36 TECHN M I ENV S, P748
[8]  
Crow L. H., 1988, P ANN REL MAINT S, P248
[9]  
Crow L.H., 1974, RELIABILITY BIOMETRY, P379
[10]  
CROW LH, 1990, P ANNU REL MAINT SYM, P275