Inventory control of service parts in the final phase: A central depot and repair kits

被引:10
作者
Teunter, RH
Haneveld, WKK
机构
[1] Erasmus Univ, Inst Econometr, NL-3000 RD Rotterdam, Netherlands
[2] Univ Groningen, Dept Econometr, NL-9700 AV Groningen, Netherlands
关键词
inventory control; service parts; obsolescence;
D O I
10.1016/S0377-2217(01)00132-1
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider an appliance manufacturer's problem of controlling the inventory of a service part in its final phase. That phase begins when the production of the appliance using that part is discontinued (time 0), and ends when the last service contract on that appliance expires. Thus. the planning horizon is deterministic and known. Parts are stocked in repair kits that repairmen carry to jobsites. If enough parts are available, then each kit contains one and the surplus is stocked at a central warehouse. Otherwise, some kits contain a service part but others do not. The objective is to minimize the total expected undiscounted costs of replenishment, inventory holding, penalty (for 'broken' jobs), and disposal (of unused parts at the end of the planning horizon). There is no set-up cost for ordering. However, if a part is not ordered at time 0, its price will be higher. We propose an ordering policy consisting of an initial order-up-to level at time 0, and a subsequent series of decreasing order-up-to levels for various intervals of the planning horizon. We present a (partly graphical) method of calculating the optimal policy, along with a numerical example. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:76 / 86
页数:11
相关论文
共 11 条
[1]   THE REPAIR KIT PROBLEM REVISITED [J].
BRUMELLE, S ;
GRANOT, D .
OPERATIONS RESEARCH, 1993, 41 (05) :994-1006
[2]   MATHEMATICAL TECHNIQUES FOR EFFICIENT RECORD SEGMENTATION IN LARGE SHARED DATABASES [J].
EISNER, MJ ;
SEVERANCE, DG .
JOURNAL OF THE ACM, 1976, 23 (04) :619-635
[3]   A MULTIPLE-ITEM INVENTORY MODEL WITH A JOB COMPLETION CRITERION [J].
GRAVES, SC .
MANAGEMENT SCIENCE, 1982, 28 (11) :1334-1337
[4]  
HAUSMAN WH, 1982, MANAGE SCI, V28, P1350
[5]   MULTIPLE PERIOD REPAIR KIT PROBLEM WITH A JOB COMPLETION CRITERION - A CASE-STUDY [J].
HEEREMANS, D ;
GELDERS, LF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) :239-248
[6]   JOB COMPLETION BASED INVENTORY SYSTEMS - OPTIMAL POLICIES FOR REPAIR KITS AND SPARE MACHINES [J].
MAMER, JW ;
SMITH, SA .
MANAGEMENT SCIENCE, 1985, 31 (06) :703-718
[7]   OPTIMIZING FIELD REPAIR KITS BASED ON JOB COMPLETION RATE [J].
MAMER, JW ;
SMITH, SA .
MANAGEMENT SCIENCE, 1982, 28 (11) :1328-1333
[8]   OPTIMIZING FIELD REPAIR KITS BASED ON JOB COMPLETION RATE [J].
MARCH, ST ;
SCUDDER, GD .
MANAGEMENT SCIENCE, 1984, 30 (08) :1025-1028
[9]   OPTIMAL INVENTORIES BASED ON JOB COMPLETION RATE FOR REPAIRS REQUIRING MULTIPLE ITEMS [J].
SMITH, SA ;
CHAMBERS, JC ;
SHLIFER, E .
MANAGEMENT SCIENCE, 1980, 26 (08) :849-852
[10]  
TEUNTER RH, 2000, INVENTORY CONTROL SE