Knowledge based-system for alternative design, cost estimating and scheduling

被引:31
作者
Mohamed, A [1 ]
Celik, T [1 ]
机构
[1] Eastern Mediterranean Univ, Dept Civil Engn, TR-10 Gazimagusa, Mersin, Turkey
关键词
cost estimating; building design; planning and scheduling; productivity; expert system;
D O I
10.1016/S0950-7051(01)00155-1
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The traditional design, cost estimating and scheduling procedures focus on assessing costs and schedule after design decisions are made and conveyed to construction drawings and design that is, they do not have a mechanism that allow the designer to perform a rapid 'what if analysis on design alternatives and cost analysis of different types of building materials and alternative schedule analysis at early stage of project without accompanying of detailed design and drawing. Moreover, the available scheduling tools are not integrated to design and cost estimating system and hence require manual input of activities lists, activities sequencing, resources, costs and durations to generate project schedule and they are unable to consider the effect of productivity factors and the resulting uncertainty inherent in each activity. This paper presents an integrated knowledge based system for construction cost estimating and scheduling. The knowledge based system supports an automated alternative design analysis with on line schematic drawing, material selection, crew selection and productivity analysis for generating activities sequencing, normal durations, productivity adjusted: durations, cost estimate, list of materials selected and their respective quantities and list of assigned crew. An analysis of alternative design, cost estimating and scheduling for a residential building using the integrated system is presented. (C) 2002 Elsevier Science, B.V. All rights reserved.
引用
收藏
页码:177 / 188
页数:12
相关论文
共 42 条
[1]   Scheduling cost optimization and neural dynamics model for construction [J].
Adeli, H ;
Karim, A .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (04) :450-458
[2]   Regularization neural network for construction cost estimation [J].
Adeli, H ;
Wu, MY .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1998, 124 (01) :18-24
[3]  
ADELI H, 1990, KNOWLEDGE ENG, V2
[4]  
ADELI H, 1988, EXPERT SYSTEM CONSTR
[5]  
ADELI H, 1990, KNOWLEDGE ENG, V1
[6]   SIMULATION-MODEL TO FORECAST PROJECT COMPLETION-TIME [J].
AHUJA, HN ;
NANDAKUMAR, V .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1985, 111 (04) :325-342
[7]  
AROCKIASAMY M, 1993, EXPERT SYSTEMS APPL
[8]  
BALDWIN JR, 1972, J CONSTR DIV ASCE, V97, P177
[9]  
BENJAMINNB, 1973, J CONSTR DIV ASCE, V99, P175
[10]  
BORCHERDING JD, 1981, J CONSTRUCT DIV-ASCE, V107, P443