A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes

被引:71
作者
Giannelos, NF [1 ]
Georgiadis, MC [1 ]
机构
[1] Chem Proc Engn Res Inst, Ctr Res & Technol Hellas, Thessaloniki 570011, Greece
关键词
D O I
10.1021/ie010399f
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
A new continuous-time formulation for scheduling short-term multipurpose batch processes is presented. The formulation gives rise to a mixed-integer linear programming (MILP) model. The state-task network (STN) representation forms the basis of the proposed approach. A number of event points is prepostulated, which is the same for all tasks in the process. Event times are defined by the ends of task execution, and they are generally different for different tasks of the process, giving rise to a nonuniform time grid. The necessary time monotonicity for single tasks is guaranteed by means of simple duration constraints. Suitable sequencing constraints, applicable to batch tasks involving the same state, are also introduced, so that state balances are properly posed in the context of the nonuniform time grid. The expression of duration and sequencing constraints is greatly simplified by hiding all unit information within the task data. Three benchmark problems are used to illustrate the efficiency and applicability of the new formulation. Results are shown to compare favorably with existing continuous-time formulations in terms of model size and computational effort.
引用
收藏
页码:2178 / 2184
页数:7
相关论文
共 26 条
[1]  
Brooke A., 1998, GAMS USERS GUIDE
[2]   Reply to comments on "An improved continuous-time formulation for the short-term scheduling of multipurpose batch plants" [J].
Castro, P ;
Barbosa-Póvoa, APFD ;
Matos, H .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2001, 40 (22) :5042-5042
[3]   An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants [J].
Castro, P ;
Barbosa-Póvoa, APFD ;
Matos, H .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2001, 40 (09) :2059-2068
[4]  
*GAMS DEV CORP, 2000, GAMS SOLV MAN
[5]   Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (11) :4341-4359
[6]   Effective continuous-time formulation for short-term scheduling.: 3.: Multiple intermediate due dates [J].
Ierapetritou, MG ;
Hené, TS ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1999, 38 (09) :3446-3461
[7]   Comments on "An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants" [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2001, 40 (22) :5040-5041
[8]   Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (11) :4360-4374
[9]   Planning and scheduling of parallel semicontinuous processes .2. Short-term scheduling [J].
Karimi, IA ;
McDonald, CM .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1997, 36 (07) :2701-2714
[10]   A GENERAL ALGORITHM FOR SHORT-TERM SCHEDULING OF BATCH-OPERATIONS .1. MILP FORMULATION [J].
KONDILI, E ;
PANTELIDES, CC ;
SARGENT, RWH .
COMPUTERS & CHEMICAL ENGINEERING, 1993, 17 (02) :211-227