Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times

被引:17
作者
Elhafsi, M
Bai, SX
机构
[1] UNIV CALIF RIVERSIDE,A GARY ANDERSON GRAD SCH MANAGEMENT,RIVERSIDE,CA 92521
[2] UNIV FLORIDA,DEPT IND & SYST ENGN,GAINESVILLE,FL 32611
关键词
dynamic setups; production and setup control; optimal control;
D O I
10.1007/BF00121663
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper deals with the optimal control of a one-machine two-product manufacturing system with setup changes, operating in a continuous time dynamic environment. The system is deterministic. When production is switched from one product to the other, a known constant setup time and a setup cost are incurred. Each product has specified constant processing time and constant demand rate, as well as an infinite supply of raw material. The problem is formulated as a feedback control problem. The objective is to minimize the total backlog, inventory and setup costs incurred over a finite horizon. The optimal solution provides the optimal production rate and setup switching epochs as a function of the state of the system (backlog and inventory levels). For the steady state, the optimal cyclic schedule is determined. To solve the transient case, the system's state space is partitioned into mutually exclusive regions such that with each region, the optimal control policy is determined analytically.
引用
收藏
页码:183 / 216
页数:34
相关论文
共 26 条
[1]   Transient and steady-state analysis of a manufacturing system with setup changes [J].
Bai, SX ;
Elhafsi, M .
JOURNAL OF GLOBAL OPTIMIZATION, 1996, 8 (04) :349-378
[2]  
BAI SX, 1993, 9328 U FLOR DEP IND
[3]   ONE-STAGE AND 2-STAGE SCHEDULING OF 2 PRODUCTS WITH DISTRIBUTED INSERTED IDLE TIME - THE BENEFITS OF A CONTROLLABLE PRODUCTION-RATE [J].
BUZACOTT, JA ;
OZKARAHAN, IA .
NAVAL RESEARCH LOGISTICS, 1983, 30 (04) :675-696
[4]  
CARAMANIS M, 1991, P 1991 NSF DES MAN S
[5]   ECONOMIC LOT SCHEDULING FOR MULTIPLE PRODUCTS ON PARALLEL IDENTICAL PROCESSORS [J].
CARRENO, JJ .
MANAGEMENT SCIENCE, 1990, 36 (03) :348-358
[6]  
CONNOLLY S, 1992, LMP920005 MIT LAB MA
[7]   THE ECONOMIC LOT-SCHEDULING PROBLEM - ACHIEVING FEASIBILITY USING TIME-VARYING LOT SIZES [J].
DOBSON, G .
OPERATIONS RESEARCH, 1987, 35 (05) :764-771
[8]  
ELHAFSI M, 1996, IN PRESS J GLOBAL OP
[9]  
ELHAFSI M, 1996, IN PRESS J COMPUTERS
[10]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598