Financial risk management for new technology integration in energy planning under uncertainty

被引:27
作者
Ahmed, Sajjad [1 ,3 ]
Elsholkami, Mohamed [1 ]
Elkamel, Ali [1 ]
Du, Juan [2 ]
Ydstie, Erik B. [2 ]
Douglas, Peter L. [1 ]
机构
[1] Univ Waterloo, Dept Chem Engn, Waterloo, ON N2L 3G1, Canada
[2] Carnegie Mellon Univ, Dept Chem Engn, Pittsburgh, PA 15213 USA
[3] PPG, Pittsburgh, PA USA
关键词
Financial risk management; Energy planning; Optimization; New technology integration; SUPPLY CHAIN; OPTIMIZATION; SYSTEMS;
D O I
10.1016/j.apenergy.2014.03.058
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
080707 [能源环境工程]; 082001 [油气井工程];
摘要
This paper proposes a new methodology to include financial risk management in the framework of two-stage stochastic programming for energy planning under uncertainties in demand and fuel price. A deterministic mixed integer linear programming formulation is extended to a two-stage stochastic programming model in order to take into account random parameters that have discrete and finite probabilistic distributions. This was applied to a case study focusing on planning the capacity supply to meet the projected electricity demand for the fleet of electricity generation stations owned and operated by Ontario Power Generation (OPG). The objective of the proposed mathematical model is to minimize cost subject to environmental constraints. The case study is investigated by considering only existing technologies and also by considering the integration of new technologies that help achieve stricter carbon reduction requirements. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:75 / 81
页数:7
相关论文
共 42 条
[1]
Abduljabbar WK, 2010, P 2 INT C TECHN OP M
[2]
Ahmed S, 2009, 8 ANN C CARB CAPT SE
[3]
A multi-objective stochastic programming approach for supply chain design considering risk [J].
Azaron, A. ;
Brown, K. N. ;
Tarim, S. A. ;
Modarres, M. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 116 (01) :129-138
[4]
Bagajewics M, 2003, P FDN COMP AID PROC, P265
[5]
Managing financial risk in planning under uncertainty [J].
Barbaro, A ;
Bagajewicz, MJ .
AICHE JOURNAL, 2004, 50 (05) :963-989
[6]
Bellman R. E., 1971, Decision-making in a fuzzy environment, DOI 10.1287/mnsc.17.4.B141
[7]
A medium-term integrated risk management model for a hydrothermal generation company [J].
Cabero, J ;
Baíllo, A ;
Cerisola, S ;
Ventosa, M ;
García-Alcalde, A ;
Perán, F ;
Relaño, G .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (03) :1379-1388
[8]
Risk Management in the Oil Supply Chain: A CVaR Approach [J].
Carneiro, Maria C. ;
Ribas, Gabriela P. ;
Hamacher, Silvio .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2010, 49 (07) :3286-3294
[9]
CHANCE-CONSTRAINED PROGRAMMING [J].
CHARNES, A ;
COOPER, WW .
MANAGEMENT SCIENCE, 1959, 6 (01) :73-79
[10]
A review of computer tools for analysing the integration of renewable energy into various energy systems [J].
Connolly, D. ;
Lund, H. ;
Mathiesen, B. V. ;
Leahy, M. .
APPLIED ENERGY, 2010, 87 (04) :1059-1082