Effect of information sharing in supply chains with flexibility

被引:78
作者
Chan, H. K. [1 ]
Chan, F. T. S. [1 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
Information sharing; Flexibility; Multi-agent; Coordination; Make-to-order; TO-ORDER ENVIRONMENT; ELECTRONIC COMMERCE; PERFORMANCE; MODEL; NEGOTIATION; REPLENISHMENT; COMPETITION; MANAGEMENT; NETWORKS; SYSTEMS;
D O I
10.1080/00207540600767764
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Coordination plays a pivotal role in successful design and implementation of supply chains, especially for those that are formed by independent and autonomous companies. More specifically, information sharing has widely been regarded as an essential tool to coordinate supply chains activities in order to overcome supply chains dynamics. A major contribution of this paper is to analyse the effects of negotiation-based information sharing in a distributed make-to-order manufacturing supply chain in a multi-period, multi-product types environment, which is modelled as a multi-agent system. Information can only be exchanged through negotiation in the agent-based framework with delivery quantity and due date flexibility, which is significantly different from the past reported literature that shared information is available anytime. Four schemes, namely, stochastic model (STO), flexibility in delivery quantity and due date without information sharing (FLEX_NI), flexibility in delivery quantity and due date with partial information sharing (FLEX_PI), and flexibility in delivery quantity and due date with full information sharing (FLEX_FI), are considered. Simulation results indicate that FLEX_PI in the system has comparable performance in terms of total cost and fill rate against FLEX_FI, while both systems outperform STO and FLEX_NI. Considering the associated costs and limitations to achieve full information sharing, partial information sharing may be more practical in real-life applications. Nevertheless, the proposed agent-based framework with delivery quantity and due date flexibility but without information sharing (i.e. FLEX_NI) is not that worse as compared with the two schemes of information sharing (FLEX_PI and FLEX_FI). Therefore, by taking the difficulties of implementing information sharing into account, flexibility in delivery quantity and due date that could be introduced may be a more feasible solution.
引用
收藏
页码:213 / 232
页数:20
相关论文
共 30 条
[1]  
[Anonymous], 2000, INT J MANUFACTURING, DOI DOI 10.1504/IJMTM.2000.001329
[2]   An advanced agent-based order planning system for dynamic networked enterprises [J].
Azevedo, AL ;
Toscano, C ;
Sousa, JP ;
Soares, AL .
PRODUCTION PLANNING & CONTROL, 2004, 15 (02) :133-144
[3]   Supply chain inventory management and the value of shared information [J].
Cachon, GP ;
Fisher, M .
MANAGEMENT SCIENCE, 2000, 46 (08) :1032-1048
[4]   Integrated model for supplier selection and negotiation in a make-to-order environment [J].
Cakravastia, A ;
Takahashi, K .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (21) :4457-4474
[5]   Model for negotiating the price and due date for a single order with multiple suppliers in a make-to-order environment [J].
Cakravastia, A ;
Nakamura, N .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (14) :3425-3440
[6]   Negotiation support for Make-To-Order operations in business-to-business electronic commerce [J].
Calosso, T ;
Cantamessa, M ;
Gualano, M .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2004, 20 (05) :405-416
[7]   A simulation study with quantity flexibility in a supply chain subjected to uncertainties [J].
Chan, FTS ;
Chan, HK .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2006, 19 (02) :148-160
[8]   A new model for manufacturing supply chain networks: a multiagent approach [J].
Chan, FTS ;
Chan, HK .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2004, 218 (04) :443-454
[9]   The future trend on system-wide modelling in supply chain studies [J].
Chan, FTS ;
Chan, HK .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 25 (7-8) :820-832
[10]  
de Souza R., 2000, Integrated Manufacturing Systems, V11, P348, DOI 10.1108/09576060010335627