Coordinating Vehicle-to-Grid Services With Energy Trading

被引:141
作者
Al-Awami, Ali T. [1 ]
Sortomme, Eric [2 ]
机构
[1] King Fahd Univ Petr & Minerals, Dept Elect Engn, Dhahran 31261, Saudi Arabia
[2] Alstom Grid, Redmond, WA 98052 USA
关键词
Coordinated bidding strategy; EV charging; load-serving entities; mixed integer stochastic programming; risk; thermal power production; V2G; wind power production; SHORT-TERM ENERGY; WIND GENERATION; POWER; OPTIMIZATION; OPERATION; STORAGE; SCALE; COST;
D O I
10.1109/TSG.2011.2167992
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Energy trading in day-ahead electricity markets can be highly risky, especially for entities with considerable stochastic energy penetration. This is because of the uncertain energy prices, balancing prices, stochastic energy availability, and demand. In this work, coordinating unidirectional vehicle-to-grid (V2G) services with energy trading is proposed to mitigate these trading risks. This coordination is possible due to the recent advances in smart grid technologies. The case of a load-serving entity (LSE) that owns thermal and wind plants, and is obligated to serve a load with a significant number of electric vehicles (EVs) is investigated. The problem of energy trading in coordination with V2G services is formulated as a mixed-integer stochastic linear program. The objective is to maximize the LSE's profits while maintaining its risks within acceptable levels. The conditional value at risk is used as a risk control measure. A case study that compares coordinated vs. uncoordinated EV charging is presented. The simulation results demonstrate the benefits of coordinating V2G services with other generation assets for the LSE and the EV owners as well as the impact of this coordination on the environment.
引用
收藏
页码:453 / 462
页数:10
相关论文
共 47 条
[31]   Short-Term Trading for a Wind Power Producer [J].
Morales, Juan M. ;
Conejo, Antonio J. ;
Perez-Ruiz, Juan .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2010, 25 (01) :554-564
[32]   Integration of Electric Vehicles in the Electric Power System [J].
Pecas Lopes, Joao A. ;
Soares, Filipe Joel ;
Rocha Almeida, Pedro M. .
PROCEEDINGS OF THE IEEE, 2011, 99 (01) :168-183
[33]   Trading wind generation from short-term Probabilistic forecasts of wind power [J].
Pinson, Pierre ;
Chevallier, Christophe ;
Kariniotakis, George N. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (03) :1148-1156
[34]   Multimarket optimal bidding for a power producer [J].
Plazas, MA ;
Conejo, AJ ;
Prieto, FJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (04) :2041-2050
[35]   The effect of communication architecture on the availability, reliability, and economics of plug-in hybrid electric vehicle-to-grid ancillary services [J].
Quinn, Casey ;
Zimmerle, Daniel ;
Bradley, Thomas H. .
JOURNAL OF POWER SOURCES, 2010, 195 (05) :1500-1509
[36]  
Rockafellar R., 2000, Journal of risk, V2, P21, DOI [10.21314/JOR.2000.038, DOI 10.21314/JOR.2000.038]
[37]   Optimal Charge Control of Plug-In Hybrid Electric Vehicles in Deregulated Electricity Markets [J].
Rotering, Niklas ;
Ilic, Marija .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (03) :1021-1029
[38]   Plug-in Vehicles and Renewable Energy Sources for Cost and Emission Reductions [J].
Saber, Ahmed Yousuf ;
Venayagamoorthy, Ganesh Kumar .
IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 2011, 58 (04) :1229-1238
[39]   Urban form and commuting behaviour: A cross-European perspective [J].
Schwanen, T .
TIJDSCHRIFT VOOR ECONOMISCHE EN SOCIALE GEOGRAFIE, 2002, 93 (03) :336-343
[40]  
Sharpe W. F., 1970, Portfolio theory and capital markets