A heuristic for scheduling in a flowshop with the bicriteria of makespan and maximum tardiness minimization

被引:45
作者
Chakravarthy, K [1 ]
Rajendran, C [1 ]
机构
[1] Indian Inst Technol, Dept Humanities & Social Sci, Ind Engn & Management Div, Madras 600036, Tamil Nadu, India
关键词
flowshop scheduling; heuristics; makespan; tardiness;
D O I
10.1080/095372899232777
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article deals with the development of a heuristic for scheduling in a flowshop with the objective of minimizing the makespan and maximum tardiness of a job. The heuristic makes use of the simulated annealing technique. The proposed heuristic is relatively evaluated against the existing heuristic for scheduling to minimize the weighted sum of the makespan and maximum tardiness of a job. The results of the computational evaluation reveal that the proposed heuristic performs better than the existing one.
引用
收藏
页码:707 / 714
页数:8
相关论文
共 25 条
[1]  
[Anonymous], 1970, MANAGE SCI, DOI [10.1287/mnsc.16.10.b630, DOI 10.1287/MNSC.16.10.B630]
[2]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[3]  
DANIELS RL, 1990, NAV RES LOG, V37, P981, DOI 10.1002/1520-6750(199012)37:6<981::AID-NAV3220370617>3.0.CO
[4]  
2-H
[5]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[6]  
French S., 1982, Sequencing and Scheduling
[7]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[8]   4 SIMPLE HEURISTICS FOR SCHEDULING A FLOW-SHOP [J].
GELDERS, LF ;
SAMBANDAM, N .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1978, 16 (03) :221-231
[9]   A NEW HEURISTIC FOR THE N-JOB, M-MACHINE FLOWSHOP PROBLEM [J].
HO, JC ;
CHANG, YL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 52 (02) :194-202
[10]   FLOWSHOP SEQUENCING WITH MEAN FLOWTIME OBJECTIVE [J].
HO, JC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (03) :571-578