A NEW HEURISTIC FOR THE N-JOB, M-MACHINE FLOWSHOP PROBLEM

被引:122
作者
HO, JC
CHANG, YL
机构
[1] College of Management, Georgia Institute of Technology, Atlanta
关键词
FLOWSHOP SCHEDULING; PRODUCTION SCHEDULING; MACHINE SEQUENCING;
D O I
10.1016/0377-2217(91)90080-F
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper describes a new improvement heuristic for solving the flow-shop scheduling problem. This new method minimizes gaps between successive operations in solutions generated by other heuristics. We compare the new heuristic with five well-known heuristics and the random case by using simulation with makespan, mean flow time and mean utilization as the performance measures. The simulation results show that the new heuristic improves the best heuristic in the three measures by a significant percentage, while the increase in CPU time is modest.
引用
收藏
页码:194 / 202
页数:9
相关论文
共 16 条
[2]  
Baker K., 1974, INTRO SEQUENCING SCH
[3]   SOLUTIONS TO CONSTRAINED FLOWSHOP SEQUENCING PROBLEM [J].
BONNEY, MC ;
GUNDRY, SW .
OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (04) :869-883
[4]  
Campbell H. G., 1970, MANAGE SCI, V16, P630
[5]  
Coffman E.G., 1976, COMPUTER JOB SHOP SC
[6]  
Conway R, 1967, THEORY SCHEDULING
[7]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[8]  
French S., 1982, SEQUENCING SCHEDULIN
[9]   FUNCTIONAL HEURISTIC ALGORITHM FOR FLOWSHOP SCHEDULING PROBLEM [J].
GUPTA, JND .
OPERATIONAL RESEARCH QUARTERLY, 1971, 22 (01) :39-&
[10]   AN EXTENSION OF PALMER HEURISTIC FOR THE FLOW-SHOP SCHEDULING PROBLEM [J].
HUNDAL, TS ;
RAJGOPAL, J .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (06) :1119-1124