A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes

被引:92
作者
Boctor, FF
机构
[1] Centre de Service, Orient. Rech. sur Competitivite I., Université Laval
基金
加拿大自然科学与工程研究理事会;
关键词
project scheduling; resource allocation; heuristics;
D O I
10.1016/0377-2217(95)00359-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a heuristic procedure for solving non-preemptive resource-constrained project scheduling problems in which resources are limited but renewable from period to period. Associated with each activity is a set of possible durations and the corresponding resource requirements, and the objective is to minimize the overall project duration. Unlike other heuristics that consider schedulable activities separately and schedule only one activity at a time, the heuristic proposed in this paper enumerates some schedulable combinations of activities and chooses from them the one having the best value for an evaluation criterion. It is shown that, based on a set of 240 randomly generated problems, the proposed heuristic outperforms the best heuristics proposed in the open literature up to the moment when this research was done.
引用
收藏
页码:349 / 361
页数:13
相关论文
共 14 条
[1]   HEURISTICS FOR SCHEDULING PROJECTS WITH RESOURCE RESTRICTIONS AND SEVERAL RESOURCE-DURATION MODES [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (11) :2547-2558
[2]  
BOCTOR FF, 1994, IN PRESS INT J PRODU
[3]  
Conover W. J., 1980, Practical nonparametric statistics, V2nd
[4]   NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DREXL, A ;
GRUENEWALD, J .
IIE TRANSACTIONS, 1993, 25 (05) :74-81
[5]  
Elmaghraby S.E., 1977, Activity Networks: Project Planning and Control by Network Models
[6]   COMPUTATIONAL EXPERIENCE WITH A BACKTRACKING ALGORITHM FOR SOLVING A GENERAL-CLASS OF PRECEDENCE AND RESOURCE-CONSTRAINED SCHEDULING PROBLEMS [J].
PATTERSON, JH ;
TALBOT, FB ;
SLOWINSKI, R ;
WEGLARZ, J .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :68-79
[7]  
PATTERSON JH, 1989, ADV PROJECT SCHEDULI, P3
[10]  
SLOWINSKI R, 1978, LECT NOTES CONTROL I, V7, P278