An optimal production and inspection strategy with preventive maintenance error and rework

被引:60
作者
Chen, Yan-Chun
机构
[1] Department of Industrial Engineering and Management, Tungnan University
关键词
Preventive maintenance; Imperfect rework; Imperfect process; Preventive maintenance error; Production lot; IMPERFECT PRODUCTION PROCESSES; LOT-SIZING PROBLEM; PRODUCTION SYSTEM; INTEGRATED PRODUCTION; PRODUCTION-INVENTORY; PRODUCTION QUANTITY; PLANNING-MODEL; QUALITY MODEL; POLICIES; BREAKDOWNS;
D O I
10.1016/j.jmsy.2012.07.010
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study considers the integrated problem of production, preventive maintenance (PM), inspection, and inventory for an imperfect production process where rework and PM error exist. PM is performed when the process is in a controlled state. The correct implementation of PM results in a lower system failure rate, whereas a PM error results in the system shifting to the out-of-control state with a certain probability. The age of the system after PM is correlated with the level of PM performed. When the process in an out-of-control state produces a certain percentage of non-conforming items, we assume that a certain proportion of the non-conforming items can be reworked into conforming items. In a deteriorating production system, we determine the optimal inspection interval, inspection frequency, and production quantity that will yield the maximal unit expected profit. Numerical analyses are used to investigate the effectiveness of imperfect PM and to explore the effect of rework and PM error on profit. (C) 2012 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:99 / 106
页数:8
相关论文
共 26 条
[1]   An integrated production and preventive maintenance planning model [J].
Aghezzaf, E. H. ;
Jamali, M. A. ;
Ait-Kadi, D. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (02) :679-685
[2]   ECONOMIC DESIGN OF XBAR-CONTROL CHARTS UNDER WEIBULL SHOCK-MODELS [J].
BANERJEE, PK ;
RAHIM, MA .
TECHNOMETRICS, 1988, 30 (04) :407-414
[3]   The economic production lot-sizing problem with imperfect production processes and imperfect maintenance [J].
Ben-Daya, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 76 (03) :257-264
[4]  
Ben-Daya M, 1999, IIE TRANS, V31, P491, DOI 10.1023/A:1007642104680
[5]   Integrated production and quality model under various preventive maintenance policies [J].
Ben-Daya, M ;
Makhdoum, M .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (08) :840-853
[6]   Optimal batch quantity models for a lean production system with in-cycle rework and scrap [J].
Biswas, Pablo ;
Sarker, Bhaba R. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (23) :6585-6610
[7]  
Chen JM, 2010, IJISE, V92, DOI [10.1504/IJISE.2010.033999, DOI 10.1504/IJISE.2010.033999]
[8]   Optimal production lot sizing with rework, scrap rate, and service level constraint [J].
Chiu, Singa Wang ;
Ting, Chia-Kuan ;
Chiu, Yuan-Shyi Peter .
MATHEMATICAL AND COMPUTER MODELLING, 2007, 46 (3-4) :535-549
[9]  
Hariga M, 1998, NAV RES LOG, V45, P423, DOI 10.1002/(SICI)1520-6750(199806)45:4<423::AID-NAV8>3.0.CO
[10]  
2-7