共 23 条
[11]
Muralidharan C., 2002, J SUPPLY CHAIN MANAG, V38, P22, DOI DOI 10.1111/J.1745-493X.2002.TB00140.X
[16]
Saaty TL., 1980, The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation
[19]
A heuristic genetic algorithm for subcontractor selection in a global manufacturing environment
[J].
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS,
2001, 31 (02)
:189-198
[20]
WANG F, 2004, NONCRYSTALLINE MAT O, V1, P15