Bi-objective simulated annealing approaches for no-wait two-stage flexible flow shop scheduling problem

被引:61
作者
Jolai, F. [1 ]
Asefi, H. [1 ]
Rabiee, M. [2 ]
Ramezani, P. [3 ]
机构
[1] Univ Tehran, Dept Ind Engn, Tehran, Iran
[2] Bu Ali Sina Univ, Dept Ind Engn, Tuyserkans Engn Fac, Hamadan, Iran
[3] KN Toosi Univ Technol, Dept Ind Engn, Tehran, Iran
关键词
Multi-objective optimization; No-wait flexible flow shop; Simulated annealing; Taguchi method; IMMUNE ALGORITHM; SETUP TIMES; MAKESPAN; HEURISTICS; FLOWSHOPS; SYSTEM; LINES; JOBS;
D O I
10.1016/j.scient.2012.10.044
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper focuses on solving the bi-objective problem of no-wait two-stage flexible flow shop scheduling. The objectives considered in this study are minimum makespan (C-max), as well as maximum tardiness of jobs (T-max). This problem is known as NP-hard. Hence, three bi-objective optimization methods based on simulated annealing, called CWSA (classical weighted simulated annealing), NWSA (normalized weighted simulated annealing), and FSA (fuzzy simulated annealing), are developed to solve the problem with the goal of finding approximations of the optimal Pareto front. Due to the fact that meta-heuristic algorithms are very vigilant of parameter values, we proposed a new reliable method, by mixing the Taguchi method and a Multi-Objective Decision Making (MODM) approach, for achieving our purpose. The algorithms are evaluated by solving both small and large scale problems. The performances are evaluated in terms of a relative deviation index. Finally, the result of the study is discussed and concluded, and potential areas of further study are highlighted. (C) 2013 Sharif University of Technology. Production and hosting by Elsevier B.V. All rights reserved.
引用
收藏
页码:861 / 872
页数:12
相关论文
共 46 条
[11]   A fast hybrid particle swarm optimization algorithm for flow shop sequence dependent group scheduling problem [J].
Hajinejad, D. ;
Salmasi, N. ;
Mokhtari, R. .
SCIENTIA IRANICA, 2011, 18 (03) :759-764
[12]   No-wait two-stage multiprocessor flow shop scheduling with unit setup [J].
Huang, Rong-Hwa ;
Yang, Chang-Lin ;
Huang, Yau-Chi .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (9-10) :921-927
[13]  
Johnson S.M., 1954, NAVAL RES LOGISTICS, V1, P61, DOI [DOI 10.1002/NAV.3800010110, 10.1002/nav.3800010110]
[14]   A novel hybrid meta-heuristic algorithm for a no-wait flexible flow shop scheduling problem with sequence dependent setup times [J].
Jolai, F. ;
Rabiee, M. ;
Asefi, H. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (24) :7447-7466
[15]   A genetic algorithm for solving no-wait flexible flow lines with due window and job rejection [J].
Jolai, Fariborz ;
Sheikh, Shaya ;
Rabbani, Massoud ;
Karimi, Behrooz .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (5-6) :523-532
[16]   A SIMULATED ANNEALING PROCEDURE FOR SINGLE ROW LAYOUT PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEMS [J].
KOUVELIS, P ;
CHIANG, WC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (04) :717-732
[17]   Hybrid flow shop scheduling: A survey [J].
Linn, R ;
Zhang, W .
COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 37 (1-2) :57-61
[18]  
Liu Zhixin, 2003, Tsinghua Science and Technology, V8, P43
[19]   Multi-objective optimization problems with fuzzy relation equation constraints [J].
Loetamonphong, H ;
Fang, SC ;
Young, RE .
FUZZY SETS AND SYSTEMS, 2002, 127 (02) :141-164
[20]   Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines [J].
Low, C .
COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (08) :2013-2025