Resource-constrained project scheduling by simulated annealing

被引:132
作者
Boctor, FF
机构
[1] Centre de Service, d’Orientation et de Recherche sur la Compétitivité Internationale et I’Ingénierie de I’Entreprise-Réseau, Université Laval, QC
关键词
D O I
10.1080/00207549608905028
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a new adaptation of the simulated annealing algorithm for solving non-preemptive resource-constrained project scheduling problems in which resources are limited but renewable from period to period. This algorithm is able to handle single-mode and multi-mode problems and to optimize different objective functions. Statistical experiments show the efficiency of the proposed algorithm even in comparison to some Tabu search heuristics.