Assembly line balancing and group working: A heuristic procedure for workers' groups operating on the same product and workstation

被引:80
作者
Dimitriadis, SG [1 ]
机构
[1] Inst Educ Technol, Dept Business Adm, Serres 62124, Greece
关键词
assembly line balancing; heuristic methods;
D O I
10.1016/j.cor.2005.02.027
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we examine an assembly line balancing problem that differs from the conventional one in the sense that there are multi-manned workstations, where workers' groups simultaneously perform different assembly works on the same product and workstation. This situation requires that the product is of sufficient size, as for example in the automotive industry, so that the workers do not block each other during the assembly work. The proposed approach here results in shorter physical line length and production space utilization improvement, because the same number of workers can be allocated to fewer workstations. Moreover, the total effectiveness of the assembly line, in terms of idle time and production output rate, remains the same. A heuristic assembly line balancing procedure is thus developed and illustrated. Finally, experimental results of a real-life automobile assembly plant case and well-known problems from the literature indicate the effectiveness and applicability of the proposed approach in practice. (c) 2005 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2757 / 2774
页数:18
相关论文
共 23 条
[1]   A METHOD FOR ASSEMBLY LINE BALANCING WITH MORE THAN ONE WORKER IN EACH STATION [J].
AKAGI, F ;
OSAKI, H ;
KIKUCHI, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1983, 21 (05) :755-770
[2]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[3]   BALANCING 2-SIDED ASSEMBLY LINES - A CASE-STUDY [J].
BARTHOLDI, JJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (10) :2447-2461
[4]  
BAXEY GM, 1974, MANAGE SCI, V20, P1010
[5]   A SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM [J].
BAYBARS, I .
MANAGEMENT SCIENCE, 1986, 32 (08) :909-932
[6]  
BECKER B, IN PRESS EUROPEAN J
[7]  
Bukchin J, 2004, EUR J OPER RES, V156, P326, DOI [10.1016/S0377-2217(03)00054-7, 10.1016/s0377-2217(03)00054-7]
[8]   A STATE-OF-THE-ART REVIEW OF PARALLEL-MACHINE SCHEDULING RESEARCH [J].
CHENG, TCE ;
SIN, CCS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 47 (03) :271-292
[9]  
DIMITRIADIS S, 1995, YUGOSLAV J OPERATION, V5, P259
[10]   Alternatives to line assembly: Some Swedish examples [J].
Engstrom, T ;
Jonsson, D ;
Johansson, B .
INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 1996, 17 (03) :235-245