MULTI-OBJECTIVE CONTRACTOR'S RANKING BY APPLYING THE MOORA METHOD

被引:128
作者
Brauers, Willem Karel M. [1 ]
Zavadskas, Edmundas Kazimieras [2 ]
Turskis, Zenonas [2 ]
Vilutiene, Tatjana [2 ]
机构
[1] Univ Antwerp, B-2600 Berchem Antwerpen, Belgium
[2] Vilnius Gediminas Tech Univ, LT-10223 Vilnius, Lithuania
关键词
contractor; decision making; multi-objectives; alternatives; sampling; ratio analysis; dimensionless measures; ranking and optimization; the MOORA method;
D O I
10.3846/1611-1699.2008.9.245-255
中图分类号
F [经济];
学科分类号
02 ;
摘要
Construction, taking off, maintenance and facilities management of a building is a typical example of consumer sovereignty: the new owner likes to have a reasonable price to pay, to have confidence in the contractor, to know about the duration of the works, the service after completion and the quality of the work. On the other side the contractor has his objectives too, like the satisfaction of the client, diminishing of external costs and annoyances and the management cost per employee as low as possible. In other words it concerns a problem of multi-objectives. Therefore a final ranking will show the best performing contractor from the point of view of the clients but also from the point of view of the contractors themselves. The MOORA method based on ratio analysis and dimensionless measurement will accomplish the job of ranking the contractors in a non-subjective way. As,in application the largest maintenance contractors of dwellings in Vilnius capital of Lithuania, were approached.
引用
收藏
页码:245 / 255
页数:11
相关论文
共 53 条
  • [21] Hwang C. L., 1981, Lecture Notes in Economics and Mathematical Systems, V186, P58, DOI 10.1007/978-3-642-48318-9_3
  • [22] RISK ANALYSIS APPROACH TO SELECTION OF CONTRACTOR EVALUATION METHOD
    JASELSKIS, EJ
    RUSSELL, JS
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (04): : 814 - 821
  • [23] Karlin S., 1966, TCHEBYCHEFF SYSTEMS
  • [24] Keeney R. L, 1993, DECISIONS MULTIPLE O, DOI DOI 10.1017/CBO9781139174084
  • [25] Kendall M.G., 1948, RANK CORRELATION MET
  • [26] POSSIBILITIES OF CLIENTS AND CONTRACTOR'S DISPUTES SETTLEMENT AT THE PRETRIAL STAGE
    Kersuliene, Violeta
    [J]. TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2007, 13 (02): : 139 - 143
  • [27] Lee, 1972, GOAL PROGRAMMING DEC
  • [28] Lin CT, 2007, INT J TECHNOL MANAGE, V40, P1
  • [29] MILLER DW, 1969, EXECUTIVE DECISIONS, P00237
  • [30] MINKOWSKY H, 1896, GEOMETRIE ZAHLEN