共 53 条
- [21] Hwang C. L., 1981, Lecture Notes in Economics and Mathematical Systems, V186, P58, DOI 10.1007/978-3-642-48318-9_3
- [22] RISK ANALYSIS APPROACH TO SELECTION OF CONTRACTOR EVALUATION METHOD [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (04): : 814 - 821
- [23] Karlin S., 1966, TCHEBYCHEFF SYSTEMS
- [24] Keeney R. L, 1993, DECISIONS MULTIPLE O, DOI DOI 10.1017/CBO9781139174084
- [25] Kendall M.G., 1948, RANK CORRELATION MET
- [26] POSSIBILITIES OF CLIENTS AND CONTRACTOR'S DISPUTES SETTLEMENT AT THE PRETRIAL STAGE [J]. TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2007, 13 (02): : 139 - 143
- [27] Lee, 1972, GOAL PROGRAMMING DEC
- [28] Lin CT, 2007, INT J TECHNOL MANAGE, V40, P1
- [29] MILLER DW, 1969, EXECUTIVE DECISIONS, P00237
- [30] MINKOWSKY H, 1896, GEOMETRIE ZAHLEN