A parametric procedure for multicriterion sequence scheduling for Just-In-Time mixed-model assembly lines

被引:39
作者
Aigbedo, H
Monden, Y
机构
[1] Division of Management Science and Engineering, Institute of Policy and Planning Sciences, University of Tsukuba
关键词
D O I
10.1080/002075497194651
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The sequencing of products for final assembly in JIT mixed-model manufacturing systems is sometimes based on multiple criteria. The two main criteria that have been discussed in the literature are: the smoothing of parts utilization and the smoothing of the product load. Product rate variation smoothing and sub-assembly load variation smoothing may also be considered. One procedure for treating these multiple criteria is by the use of a weighted multi-attribute cost function, which is an aggregation of the respective objective functions. However, one difficulty which may be associated with this approach is in obtaining proper estimates for the weights. In this paper, we propose an alternative approach (a parametric procedure), which utilizes only the relative preference information for the criteria. A numerical example is presented to illustrate the procedure.
引用
收藏
页码:2543 / 2564
页数:22
相关论文
共 33 条
[1]  
Abdou G., 1993, Journal of Operations Management, V11, P225, DOI 10.1016/0272-6963(93)90001-6
[2]  
ADULBHAN P, 1980, DECISION MODELS IND
[3]   A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines [J].
Aigbedo, H ;
Monden, Y .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (11) :3107-3124
[4]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[5]   ALGORITHM FOR SOLVING MULTICRITERION LINEAR PROGRAMMING PROBLEMS WITH EXAMPLES [J].
BELENSON, SM ;
KAPUR, KC .
OPERATIONAL RESEARCH QUARTERLY, 1973, 24 (01) :65-77
[6]   A SIMULATION STUDY OF SEQUENCING RULES IN A KANBAN-CONTROLLED FLOW-SHOP [J].
BERKLEY, BJ ;
KIRAN, AS .
DECISION SCIENCES, 1991, 22 (03) :559-582
[7]  
Chankong V., 1983, Multiobjective Decision Making: Theory and Methodology
[8]  
Conway RW., 1967, THEORY SCHEDULING
[9]  
DANIELS RL, 1990, NAV RES LOG, V37, P981, DOI 10.1002/1520-6750(199012)37:6<981::AID-NAV3220370617>3.0.CO
[10]  
2-H