A parametric procedure for multicriterion sequence scheduling for Just-In-Time mixed-model assembly lines

被引:39
作者
Aigbedo, H
Monden, Y
机构
[1] Division of Management Science and Engineering, Institute of Policy and Planning Sciences, University of Tsukuba
关键词
D O I
10.1080/002075497194651
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The sequencing of products for final assembly in JIT mixed-model manufacturing systems is sometimes based on multiple criteria. The two main criteria that have been discussed in the literature are: the smoothing of parts utilization and the smoothing of the product load. Product rate variation smoothing and sub-assembly load variation smoothing may also be considered. One procedure for treating these multiple criteria is by the use of a weighted multi-attribute cost function, which is an aggregation of the respective objective functions. However, one difficulty which may be associated with this approach is in obtaining proper estimates for the weights. In this paper, we propose an alternative approach (a parametric procedure), which utilizes only the relative preference information for the criteria. A numerical example is presented to illustrate the procedure.
引用
收藏
页码:2543 / 2564
页数:22
相关论文
共 33 条
[11]  
Goicoechea A., 1982, Multiobjective Decision Analysis with Engineering and Business Applications
[12]  
Huang P. Y., 1983, Decision Sciences, V14, P326, DOI 10.1111/j.1540-5915.1983.tb00189.x
[13]   SEQUENCING JIT MIXED-MODEL ASSEMBLY LINES [J].
INMAN, RR ;
BULFIN, RL .
MANAGEMENT SCIENCE, 1991, 37 (07) :901-904
[14]   QUICK AND DIRTY SEQUENCING FOR MIXED-MODEL MULTILEVEL JIT SYSTEMS [J].
INMAN, RR ;
BULFIN, RL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (09) :2011-2018
[15]   DESIGN AND ANALYSIS OF PULL SYSTEM, A METHOD OF MULTISTAGE PRODUCTION CONTROL [J].
KIMURA, O ;
TERADA, H .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1981, 19 (03) :241-253
[16]   LEVEL SCHEDULES FOR MIXED-MODEL ASSEMBLY LINES IN JUST-IN-TIME PRODUCTION SYSTEMS [J].
KUBIAK, W ;
SETHI, S .
MANAGEMENT SCIENCE, 1991, 37 (01) :121-122
[17]   MINIMIZING VARIATION OF PRODUCTION-RATES IN JUST-IN-TIME SYSTEMS - A SURVEY [J].
KUBIAK, W .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 66 (03) :259-271
[18]  
Kubiak W., 1994, International Journal of Flexible Manufacturing Systems, V6, P137, DOI 10.1007/BF01328809
[19]  
LEE JY, 1996, INT J ACCOUNTING, V31, P197, DOI DOI 10.1016/S0020-7063(96)90004-7
[20]   DEVELOPING PRODUCTION SCHEDULES WHICH BALANCE PART USAGE AND SMOOTH PRODUCTION LOADS FOR JUST-IN-TIME PRODUCTION SYSTEMS [J].
MILTENBURG, GJ ;
GOLDSTEIN, T .
NAVAL RESEARCH LOGISTICS, 1991, 38 (06) :893-910