An efficient algorithm for operation insertion in a multi-resource job-shop schedule with sequence-dependent setup times

被引:22
作者
Artigues, C
Roubellat, F
机构
[1] Lab Informat Avignon, F-84911 Avignon 9, France
[2] CNRS, LAAS, F-31077 Toulouse, France
关键词
practical job-shop scheduling; multi-resource operations; setup times; insertion techniques;
D O I
10.1080/09537280110069757
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Insertion of an operation inside an existing schedule is the central part of some neighbourhood search methods for off-line job-shop scheduling. It is also a basic tool to integrate unexpected jobs during on-line scheduling. In this paper is presented a new polynomial insertion algorithm of an operation inside a multi-resource job-shop schedule with sequence-dependent setup times. The considered objective is maximum lateness minimization. The algorithm is first described for the classical job-shop scheduling problem. Then, multi-resource requirements are introduced for the operations. Last, sequence-dependent setup times are considered in the multi-resource context. It is shown in the three cases that some dominance properties make the proposed insertion algorithm superior to the enumeration algorithms that can be used alternatively.
引用
收藏
页码:175 / 186
页数:12
相关论文
共 12 条
[1]   A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes [J].
Artigues, C ;
Roubellat, F .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 127 (02) :297-316
[2]  
ARTIGUES C, 1996, CESA 96 P IMACS MULT, P455
[3]   A new method for workshop real time scheduling [J].
Billaut, JC ;
Roubellat, F .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (06) :1555-1579
[4]  
Brucker P, 1996, OR SPEKTRUM, V18, P145, DOI 10.1007/BF01539706
[5]   Multi-resource shop scheduling with resource flexibility [J].
Dauzere-Peres, S ;
Roux, W ;
Lasserre, JB .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) :289-305
[7]   IMPACT OF SEQUENCE-DEPENDENT SETUP TIME ON JOB-SHOP SCHEDULING PERFORMANCE [J].
KIM, SC ;
BOBROWSKI, PM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (07) :1503-1520
[8]  
MEESTER G, 1996, THESIS U TWENTE
[9]   EXPLOITING SHOP-FLOOR STATUS INFORMATION TO SCHEDULE COMPLEX JOB SHOPS [J].
OVACIK, IM ;
UZSOY, R .
JOURNAL OF MANUFACTURING SYSTEMS, 1994, 13 (02) :73-84
[10]  
Roy B., 1964, 9 DS SEMA