GIS-based dynamic construction site material layout evaluation for building renovation projects

被引:48
作者
Su, Xing [1 ]
Andoh, Abdul Rahman [1 ]
Cai, Hubo [1 ]
Pan, Jing [2 ]
Kandil, Amr [1 ]
Said, Hisham M. [3 ]
机构
[1] Purdue Univ, Sch Civil Engn, Div Construct Engn & Management, W Lafayette, IN 47907 USA
[2] Purdue Univ, Coll Technol, Dept Bldg Construct Management, W Lafayette, IN 47907 USA
[3] Santa Clara Univ, Dept Civil Engn, Santa Clara, CA 95053 USA
关键词
GIS; Materials management; Site layout planning; Building renovation; GENETIC ALGORITHMS; MODEL; OPTIMIZATION; FACILITIES;
D O I
10.1016/j.autcon.2012.04.007
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Material layout is critical in construction planning. A poor material layout causes site congestions and the inaccessibility of certain materials, leading to project delays and cost overruns. Site material layout is mainly constrained by space and time that have to be considered in an integrated manner, which is very limited in the existing literature, particularly for building renovation projects that are typically constrained by a tight space. This study proposed a new concept, e.g. Material Accessibility Grade (MAC), to quantify the material accessibility throughout the project duration. A material layout evaluation model (MLEM) was created based on the MAC concept to integrate space and time. The MLEM was implemented on a Geographic Information System (GIS) platform and applied in a building renovation project. It was found that besides plan assessment and comparison, the MLEM could also detect spatial-temporal conflicts and suggest mitigation measures to improve material accessibility and reduce time waste. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:40 / 49
页数:10
相关论文
共 30 条
[1]   Representing work spaces generically in construction method models [J].
Akinci, B ;
Fischer, M ;
Kunz, J ;
Levitt, R .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2002, 128 (04) :296-305
[2]   Automated generation of work spaces required by construction activities [J].
Akinci, B ;
Fischer, M ;
Kunz, J .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (04) :306-315
[3]   GIS-base cost estimate integrating with material layout planning [J].
Cheng, MY ;
Yang, SC .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (04) :291-299
[4]   ArcSite: Enhanced GIS for construction site layout [J].
Cheng, MY ;
OConnor, JT .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (04) :329-336
[5]  
CHOI B, 1996, P 3 C COMP CIV ENG A, P718
[6]   New mathematical optimization model for construction site layout [J].
Easa, Said M. ;
Hossain, K. M. A. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (08) :653-662
[7]  
Fleming U., 1995, Journal of Architectural Engineering, V1, P162
[8]   Identification and resolution of work space conflicts in building construction [J].
Guo, SJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2002, 128 (04) :287-295
[9]  
HAMIANI A, 1987, THESIS U TEXAS AUSTI
[10]  
Harmanani H., 2000, Comput. Civ. Build. Eng. (2000), P1442, DOI [DOI 10.1061/40513(279)188, 10.1061/40513(279)188]