共 30 条
[2]
Automated generation of work spaces required by construction activities
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2002, 128 (04)
:306-315
[3]
GIS-base cost estimate integrating with material layout planning
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2001, 127 (04)
:291-299
[4]
ArcSite: Enhanced GIS for construction site layout
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1996, 122 (04)
:329-336
[5]
CHOI B, 1996, P 3 C COMP CIV ENG A, P718
[6]
New mathematical optimization model for construction site layout
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2008, 134 (08)
:653-662
[7]
Fleming U., 1995, Journal of Architectural Engineering, V1, P162
[9]
HAMIANI A, 1987, THESIS U TEXAS AUSTI
[10]
Harmanani H., 2000, Comput. Civ. Build. Eng. (2000), P1442, DOI [DOI 10.1061/40513(279)188, 10.1061/40513(279)188]