A case-based reasoning approach for automating disassembly process planning

被引:62
作者
Veerakamolmal, P
Gupta, SM
机构
[1] Northeastern Univ, Dept MIME, Lab Responsible Mfg, Boston, MA 02115 USA
[2] IBM Corp, Business Innovat Serv, Supply Chain Management, Waltham, MA 02454 USA
关键词
case-based reasoning; disassembly; environmental issues; process planning;
D O I
10.1023/A:1013629013031
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
One of the first processes for preparing a product for reuse, remanufacture or recycle is disassembly. Disassembly is the process of systematic removal of desirable constituents from the original assembly so that there is no impairment to any useful component. As the number of components in a product increases, the time required for disassembly, as well as the complexity of planning for disassembly rises. Thus, it is important to have the capability to generate disassembly process plans quickly in order to prevent interruptions in processing especially when multiple products are involved. Case-based reasoning (CBR) approach can provide such a capability. CBR allows a process planner to rapidly retrieve, reuse, revise, and retain solutions to past disassembly problems. Once a planning problem has been solved and stored in the case memory, a planner can retrieve and reuse the product's disassembly process plan at any time. The planner can also adapt an original plan for a new product, which does not have an existing plan in case memory. Following adaptation and application, a successful plan is retained in the case memory for future use. This paper presents the procedures to initialize a case memory for different product platforms, and to operate a CBR system, which can be used to plan disassembly processes. The procedures are illustrated using examples.
引用
收藏
页码:47 / 60
页数:14
相关论文
共 28 条
[1]  
[Anonymous], 1997, APPL CASE BASED REAS
[2]  
[Anonymous], 1995, Case-Based Reasoning in Design
[3]  
Baldwin CY, 1997, HARVARD BUS REV, V75, P84
[4]   A case-based NC code generating system for prismatic parts [J].
BenArieh, D ;
Chopra, M .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (07) :1925-1943
[5]   OPERATIONS PLANNING ISSUES IN AN ASSEMBLY DISASSEMBLY ENVIRONMENT [J].
BRENNAN, L ;
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1994, 14 (09) :57-67
[6]   Case-based reasoning in scheduling: reusing solution components [J].
Cunningham, P ;
Smyth, B .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (11) :2947-2961
[7]  
DILLON PS, 1994, IEEE SPECTRUM 0818
[8]   Demanufacturing of information technology equipment [J].
Grenchus, E ;
Keene, R ;
Nobs, C .
PROCEEDINGS OF THE 1997 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS AND THE ENVIRONMENT - ISEE-1997, 1997, :157-160
[9]   Issues in environmentally conscious manufacturing and product recovery: a survey [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (04) :811-853
[10]   Disassembly of products [J].
Gupta, SM ;
McLean, CR .
COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 31 (1-2) :225-228