共 17 条
- [1] BRUNO J, 1985, ACTA INFORM, V22, P139, DOI 10.1007/BF00264227
- [2] Chandy K. M., 1975, Operating Systems Review, V9, P169, DOI 10.1145/1067629.806534
- [3] ON THE OPTIMAL STOCHASTIC SCHEDULING OF OUT-FORESTS [J]. OPERATIONS RESEARCH, 1992, 40 : S67 - S75
- [4] SCHEDULING PRECEDENCE GRAPHS OF BOUNDED HEIGHT [J]. JOURNAL OF ALGORITHMS, 1984, 5 (01) : 48 - 59
- [6] PROFILE SCHEDULING OF OPPOSING FORESTS AND LEVEL ORDERS [J]. SIAM JOURNAL ON ALGEBRAIC AND DISCRETE METHODS, 1985, 6 (04): : 665 - 687
- [8] SCHEDULING OPPOSING FORESTS [J]. SIAM JOURNAL ON ALGEBRAIC AND DISCRETE METHODS, 1983, 4 (01): : 72 - 93