A two-period game of a closed-loop supply chain

被引:235
作者
De Giovanni, Pietro [1 ]
Zaccour, Georges [2 ]
机构
[1] VU Amsterdam Univ, Amsterdam, Netherlands
[2] HEC Montreal, Gerad, Chair Game Theory & Management, Montreal, PQ, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Closed-loop supply chain; Two-period game; Incentive; Supply-chain configuration; INVENTORY CONTROL; DESIGN; COMPETITION; MANAGEMENT; LOGISTICS; ECONOMICS; PRODUCTS; MODELS;
D O I
10.1016/j.ejor.2013.06.032
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a two-period closed-loop supply chain (CLSC) game where a remanufacturer appropriates of the returns' residual value and decides whether to exclusively manage the end-of-use product collection or to outsource it to either a retailer or a third-service provider (3P). We determine that the manufacturer outsources the product collection only when an outsourcee performs environmentally and operationally better. On the outsourcees side there is always an economic convenience in managing the product returns process exclusively, independently of returns rewards and operational performance. When outsourcing is convenient, a manufacturer always chooses a retailer if the outsourcees show equal performance. Overall, the manufacturer is more sensitive to environmental performance than to operational perfomance. Finally, there exists only a small region inside which outsouring the collection process contributes to the triple bottom line. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:22 / 40
页数:19
相关论文
共 46 条
[1]  
Agrawal V., 2009, CLOSED LOOP SUPPLY C
[2]  
[Anonymous], OPERATIONS RES
[3]   The effect of categorizing returned products in remanufacturing [J].
Aras, N ;
Boyaci, T ;
Verter, V .
IIE TRANSACTIONS, 2004, 36 (04) :319-331
[4]   Remanufacturing as a Marketing Strategy [J].
Atasu, Atalay ;
Sarvary, Miklos ;
Van Wassenhove, Luk N. .
MANAGEMENT SCIENCE, 2008, 54 (10) :1731-1746
[5]   Product reuse economics in closed-loop supply chain research [J].
Atasu, Atalay ;
Guide, V. Daniel R., Jr. ;
Van Wassenhove, Luk N. .
PRODUCTION AND OPERATIONS MANAGEMENT, 2008, 17 (05) :483-496
[6]  
Bakal IS, 2006, PROD OPER MANAG, V15, P407, DOI 10.1111/j.1937-5956.2006.tb00254.x
[7]  
Balabanis G., 1998, EUR BUS REV, P25, DOI [DOI 10.1108/09555349810195529, 10.1108/09555349810195529]
[8]  
Bhattacharya S, 2006, PROD OPER MANAG, V15, P421, DOI 10.1111/j.1937-5956.2006.tb00255.x
[9]  
Corbett C.J., 2003, BUSINESS ASPECTS CLO
[10]   Shared-savings contracts for indirect materials in supply chains: Channel profits and environmental impacts [J].
Corbett, CJ ;
DeCroix, GA .
MANAGEMENT SCIENCE, 2001, 47 (07) :881-893