A two-period game of a closed-loop supply chain

被引:236
作者
De Giovanni, Pietro [1 ]
Zaccour, Georges [2 ]
机构
[1] VU Amsterdam Univ, Amsterdam, Netherlands
[2] HEC Montreal, Gerad, Chair Game Theory & Management, Montreal, PQ, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Closed-loop supply chain; Two-period game; Incentive; Supply-chain configuration; INVENTORY CONTROL; DESIGN; COMPETITION; MANAGEMENT; LOGISTICS; ECONOMICS; PRODUCTS; MODELS;
D O I
10.1016/j.ejor.2013.06.032
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a two-period closed-loop supply chain (CLSC) game where a remanufacturer appropriates of the returns' residual value and decides whether to exclusively manage the end-of-use product collection or to outsource it to either a retailer or a third-service provider (3P). We determine that the manufacturer outsources the product collection only when an outsourcee performs environmentally and operationally better. On the outsourcees side there is always an economic convenience in managing the product returns process exclusively, independently of returns rewards and operational performance. When outsourcing is convenient, a manufacturer always chooses a retailer if the outsourcees show equal performance. Overall, the manufacturer is more sensitive to environmental performance than to operational perfomance. Finally, there exists only a small region inside which outsouring the collection process contributes to the triple bottom line. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:22 / 40
页数:19
相关论文
共 46 条
[21]  
Georgiadis P, 2006, PROD OPER MANAG, V15, P514, DOI 10.1111/j.1937-5956.2006.tb00160.x
[22]   The economics of remanufacturing under limited component durability and finite product life cycles [J].
Geyer, Roland ;
Van Wassenhove, Luk N. ;
Atasu, Atalay .
MANAGEMENT SCIENCE, 2007, 53 (01) :88-100
[23]  
Giovanni P.D., 2011, ANN OPER RES, V6, P1
[24]   The Evolution of Closed-Loop Supply Chain Research [J].
Guide, V. Daniel R., Jr. ;
Van Wassenhove, Luk N. .
OPERATIONS RESEARCH, 2009, 57 (01) :10-18
[25]   Building contingency planning for closed-loop supply chains with product recovery [J].
Guide, VDR ;
Jayaraman, V ;
Linton, JD .
JOURNAL OF OPERATIONS MANAGEMENT, 2003, 21 (03) :259-279
[26]  
Guide VDR, 2001, PROD OPER MANAG, V10, P142
[27]   Production planning and control for remanufacturing: industry practice and research needs [J].
Guide, VDR .
JOURNAL OF OPERATIONS MANAGEMENT, 2000, 18 (04) :467-483
[28]   Closed-loop supply chain network equilibrium under legislation [J].
Hammond, David ;
Beullens, Patrick .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (02) :895-908
[29]   Cooperative Advertising and Pricing in a Dynamic Stochastic Supply Chain: Feedback Stackelberg Strategies [J].
He, Xiuli ;
Prasad, Ashutosh ;
Sethi, Suresh P. .
PRODUCTION AND OPERATIONS MANAGEMENT, 2009, 18 (01) :78-94
[30]   The effect of supply chain glitches on shareholder wealth [J].
Hendricks, KB ;
Singhal, VR .
JOURNAL OF OPERATIONS MANAGEMENT, 2003, 21 (05) :501-522