A tabu search approach to scheduling an automated wet etch station

被引:52
作者
Geiger, CD
Kempf, KG
Uzsoy, R
机构
[1] Purdue University, West Lafayette, IN
[2] Intel Corporation, Chandler, AZ
[3] Delco Electronics, Kokomo, IN
[4] Knowledge Application Laboratory, Intel Corp., Phoenix, AZ
[5] Bogazici University, Istanbul
基金
美国国家科学基金会;
关键词
scheduling; semiconductor manufacturing; heuristics; flow Shop; robotic workcells;
D O I
10.1016/S0278-6125(97)85674-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses a production scheduling problem arising at the wet etching process in a semiconductor wafer fabrication facility. Material handling capacity, material processing constraints, and mixed storage policies are considered in formulating the problem as a flow shop sequencing problem with the objective of minimizing makespan (Cmax). Efficient heuristics and a tabu search procedure are developed to generate high-quality solutions in reasonable computational time. Extensive computational experiments evaluating the performance of the heuristics are reported.
引用
收藏
页码:102 / 116
页数:15
相关论文
共 27 条
[1]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[2]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[3]   SEQUENCING 1 STATE-VARIABLE MACHINE - SOLVABLE CASE OF TRAVELING SALESMAN PROBLEM [J].
GILMORE, PC ;
GOMORY, RE .
OPERATIONS RESEARCH, 1964, 12 (05) :655-&
[4]   FUTURE PATHS FOR INTEGER PROGRAMMING AND LINKS TO ARTIFICIAL-INTELLIGENCE [J].
GLOVER, F .
COMPUTERS & OPERATIONS RESEARCH, 1986, 13 (05) :533-549
[5]  
Glover F., 1990, ORSA Journal on Computing, V2, P4, DOI [10.1287/ijoc.1.3.190, 10.1287/ijoc.2.1.4]
[6]   A survey of machine scheduling problems with blocking and no-wait in process [J].
Hall, NG ;
Sriskandarajah, C .
OPERATIONS RESEARCH, 1996, 44 (03) :510-525
[7]   APPLICATION OF BRANCH AND BOUND TECHNIQUE TO SOME FLOW-SHOP SCHEDULING PROBLEMS [J].
IGNALL, E ;
SCHRAGE, L .
OPERATIONS RESEARCH, 1965, 13 (03) :400-&
[8]  
Johnson S. M., 1954, Naval Research Logistics Quarterly, V1, P61, DOI [DOI 10.1002/NAV.3800010110, 10.1002/nav.3800010110]
[9]   THE COMPLEXITY OF SCHEDULING JOBS IN REPETITIVE MANUFACTURING SYSTEMS [J].
KAMOUN, H ;
SRISKANDARAJAH, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (03) :350-364
[10]  
LAWLER EL, 1990, TRAVELING SALESMAN P